Search Results
The 2024 Interim Report on the Implementation of the Joint Programme of Measures in the Danube River Basin is Published
The 2024 Interim report on the Implementation of the Joint Program of Measures in the Danube River Basin has been published This Interim Report on the Implementation of the Joint Programme of Measures in the Danube River Basin, published three years after the adoption of the DRBMP Update 2021, reflects accomplishments and progress made together by Danube countries over the past three years, but also looking back at the adoption of the EU WFD more than 20 years ago.
-
Interim Report on the Implementation of the Joint Program of Measures in the Danube River Basin 2024 (8.2 MB)
This brochure is a snapshot of the progress to implement measures improving the environmental situation of the waters in the Danube River Basin today and what’s still yet to come as the region’s many... Inspiring and Fruitful ICPDR Hydropower Workshop in Vienna
The ICPDR held a highly successful workshop titled "Sustainable Hydropower Development and Environmental Objectives – Framework, Challenges, and Ways Forward" on 4-5 June 2024 at the BOKU River Lab in Vienna. Building on workshops from 2017 and 2021, the event brought together experts from energy and environmental policy sectors, the hydropower industry, NGOs, and researchers.
Joint Programme of Measures
The Joint Programme of Measures is constructed upon the findings of the pressure analysis and the assessment of water status. These serve as the foundation for updating the Danube River Basin Management Plan, incorporating measures of basin-wide significance aligned with the established visions and management objectives outlined in the Water Framework Directive (WFD) for the year 2027.
Significant Water Management Issues (SWMIS)
The EU Water Framework Directive aims to make all waters cleaner and healthier. To meet these requirements, the ICPDR's Danube River Basin Management Plan closely examines the most important pressures affecting water status.
Significant water management issues, called SWMIs, are the central pressures of basin-wide importance affecting the ecological and chemical status of surface waters, including pollution by organic substances, nutrients, and hazardous substances, as well as hydromorphological alterations. The first interim overview on the Significant Water Management Issues was created in 2007 for the 1st DRBM. The SWMIs outlined in this report were derived based on the requirements of the WFD and mainly related to quality aspects. For transboundary groundwater bodies, both qualitative and quantitative issues are addressed.-
Interim Overview: Significant Water Management Issues in the Danube River Basin District (583.78 KB)
Interim overview on the Significant Water Management Issues to meet the requirements of WFD (Directive 2000/60/EC) Article 14 regarding public information and consultation in preparation of developing... -
Social and Economic Drivers for Hydropower Development in Danube Countries (4.82 MB)
A comprehensive analysis of energy-economic and social aspects that affect the further development of hydropower in Danube countries. Danube Watch 3/2019 - Significant Water Management Issues: Let‘s Go SWMI
-
Interim Overview_SWMI Document for Consultation 2020 (746.83 KB)
Public Participation: Interim Overview on Significant Water Management Issues (SWMIs)
Vienna, 20 Dec 2019. The ICPDR provides an interim overview on Significant Water Management Issues (SWMIs) in the Danube River Basin District for the 3rd Danube River Basin Management Plan (3rd DRBMP) and invites the public to comment on this document until June 2020.