Search Results
Economics
Water has an economic value in all its competing uses and therefore needs to be recognized as an economic good. In order to protect water as a valuable ressource, investments are needed to be implemented by Danube countries. The implementation of measures is beneficial for all sectors including water-related ecosystems.
Joint Programme of Measures
The Joint Programme of Measures is constructed upon the findings of the pressure analysis and the assessment of water status. These serve as the foundation for updating the Danube River Basin Management Plan, incorporating measures of basin-wide significance aligned with the established visions and management objectives outlined in the Water Framework Directive (WFD) for the year 2027.
Significant Water Management Issues (SWMIS)
The EU Water Framework Directive aims to make all waters cleaner and healthier. To meet these requirements, the ICPDR's Danube River Basin Management Plan closely examines the most important pressures affecting water status.
Significant water management issues, called SWMIs, are the central pressures of basin-wide importance affecting the ecological and chemical status of surface waters, including pollution by organic substances, nutrients, and hazardous substances, as well as hydromorphological alterations. The first interim overview on the Significant Water Management Issues was created in 2007 for the 1st DRBM. The SWMIs outlined in this report were derived based on the requirements of the WFD and mainly related to quality aspects. For transboundary groundwater bodies, both qualitative and quantitative issues are addressed.Public Consultation 2021: Results
This page contains all of the various documentation on outcomes from the ICPDR's Public Consultation Process for the Danube River Basin Management Plan & Danube Flood Risk Management Plan Updates 2021
Stakeholder Consultation Workshop: Our Opinion – Our Danube
This online workshop took place on 29th/30th June 2021, with more than 130 participants attending.
National Management Plan Updates 2021
The countries of the ICPDR provide national draft national River Basin Management Plans. The countries invite the public to comment on these draft plans and contribute to their finalisation. Here, you find links to national websites with further information on public consultation opportunities and the relevant national documents.
Public Consultation Process towards the 2021 Management Plans Updates
The ICPDR supports the active involvement of stakeholders and civil society on all levels of its work. Two of the most important plans to the ICPDR are the Danube River Basin Management Plan and the Flood Risk Management Plan, aiming to implement the legal requirements of WFD and FD, comprising strategic guiding plans for water management over the course of six years. Both are to be developed with a range of public consultation measures.
WE PASS - Facilitating Fish Migration and Conservation at the Iron Gates
We Pass was an initiative aiming to facilitate fish migration in the Danube River Basin, set up by the ICPDR, Jaroslav Černi Institute, DDNI, CDM SMITH, OAK Consultants, and the Norwegian Institute for Nature Research. The focus was on the preservation and reestablishment of endangered fish species migration routes in the Danube River, its tributaries, and specifically at the Iron Gates.
MEASURES - Safeguarding Sturgeons in the Danube River Basin
Sturgeons and other migratory fish species represent a historic, economic and natural heritage of the Danube River Basin and are indicators of the ecological status of aquatic ecosystems, especially of the functionality of ecological corridors. Their populations have suffered substantially from overfishing, pollution, habitat destruction and disruption of their migration routes. The need for their conservation is recognized at a high political and management level (EUSDR-PA 06, Biodiversity, DRBMP).
Interim Report on Implementation of the Joint Program of Measures in the DRBD (2012)
Interim Report on Implementation of the Joint Program of Measures in the Danube River Basin District according to Water Framework Directive Art. 15 of 2012. Main report and relevant annexes.