Search Results
Public Consultation for the Draft Management Plan Updates 2027
The ICPDR supports the active involvement of stakeholders and civil society on all levels of its work. Two of the most important plans to the ICPDR are the Danube River Basin Management Plan and the Flood Risk Management Plan, aiming to implement the legal requirements of Water Framework Directive (WFD) and the Floods Directive (FD), comprising strategic guiding plans for water management over the course of six years. Both are to be updated with a range of public consultation measures.
Receiving Sea: Black Sea
The Danube River flows into the Black Sea at the Danube Delta, making the Black Sea the receiving sea for the Danube's water. A receiving sea refers to the body of water into which a river or other watercourse empties its flow. In this context, the Black Sea serves as the final destination for the waters of the Danube River.
Stakeholder Consultation: Shaping the Future of the Danube River Basin
The voice of our stakeholders matters in shaping the future of the Danube River Basin. As part of our commitment to effective water management and in accordance with the EU Water Framework Directive and EU Floods Directive, we invite all stakeholders to participate in this crucial process.
Public Consultation 2021: Results
This page contains all of the various documentation on outcomes from the ICPDR's Public Consultation Process for the Danube River Basin Management Plan & Danube Flood Risk Management Plan Updates 2021
Stakeholder Consultation Workshop: Our Opinion – Our Danube
This online workshop took place on 29th/30th June 2021, with more than 130 participants attending.
Public Consultation Process towards the 2021 Management Plans Updates
The ICPDR supports the active involvement of stakeholders and civil society on all levels of its work. Two of the most important plans to the ICPDR are the Danube River Basin Management Plan and the Flood Risk Management Plan, aiming to implement the legal requirements of WFD and FD, comprising strategic guiding plans for water management over the course of six years. Both are to be developed with a range of public consultation measures.
Public Consultation 2009
For the development of the Danube River Basin Management Plan of 2009, the ICPDR offered several possibilities to stakeholders to contribute to the development of this important work program.
Public consultation on 2015 management plans
The ICPDR supports the active involvement of stakeholders and civil society on all levels of its work. The most important work plans of the ICPDR are the Danube River Basin Management Plan and the Flood Risk Management Plan. Both were developed with a range of public consultation measures.
ICPDR Stakeholder Conference 2005
Participation of the stakeholder is a prerequisite for integrated river basin management planning.
On occasion of Danube Day 2005, the ICPDR invited stakeholders from all riparian countries to participate in the first basin-wide stakeholder conference, which was held in Budapest, as Hungary was the ICPDR President in 2005.daNUbs - Nutrient Management in the Danube River Basin
daNUbs was a mulitnational EU research project carried out under the leadership of the Technical University of Vienna. The results from this project include estimates of nutrient inputs into the river network (MONERIS), as well as an assessment of the loads of nitrogen, phosphorus and silica transported via the river network. These results indicate that the nutrient status in the Black Sea has significantly improved since the 1980s.