Search Results
ICPDR Launches Danube Hydrological Information System
The newly launched Danube Hydrological Information System (DanubeHIS) offers near real-time and validated long-term hydrological and meteorological data for the entire Danube basin. This system is instrumental in enhancing flood risk management and supporting water-related scientific research. Explore this valuable resource and its near real-time data capabilities to better understand and manage the complexities of the Danube basin.
-
Map of the Danube Accident Emergency Warning System (AEWS) (979.79 KB)
Map 3 of the report "Transboundary Accident Prevention and Control in the Danube River Basin" Flood Hazard and Risk Maps
According to Floods Directive, the Member States shall, at the level of the river basin district or unit of management, prepare flood hazard maps and flood risk maps at the most appropriate scale for the areas identified under Article 5(1).
Organisation
Task Groups
Task Groups (TGs) comprise national experts from ICPDR Contracting Parties and representatives of observer organizations. More topical than the Expert Groups of the ICPDR, Task Groups report to the Expert Groups and thereby make valuable contributions to the work of the ICPDR.
ICPDR Presidency
In the most international river basin in the world, Danube leaders recognize that they hold the future of the basin’s waters in their hands. The ICPDR is a worldwide model for cooperation in river basin management, and the role of the Danube countries as guardians of the precious resources of the river basin is always at the heart of the ICPDR’s work.
Keeper of the Danube
Welcome to the ICPDR! With more than 800,000 square kilometers, the Danube River Basin extends into the territories of 19 countries, and covers 10% of Continental Europe it is considered the most international river basin in the World!
-
DRBMP Update 2021 - Map 39: Ecological Prioritisation Regarding Restoration Measures for River and Habitat Continuity (3.46 MB)
-
DRBMP Update 2021 - Map 38: Wetlands/Floodplains (>500 ha) with Reconnection Potential – Expected Restoration Measures by 2027 (3.26 MB)
-
DRBMP Update 2021 - Map 37: River Morphological Alterations – Expected Restoration Measures by 2027 (3.42 MB)