Search Results
Tethys Project Launched to Manage Hazardous Substances Pollution in the Danube River Basin
Building on the successes of the Danube Hazard m3c project, the Tethys project was launched in January 2024. Funded by the Danube Regional Programme, Tethys will bring together 13 project partners and 10 associated strategic partners to address hazardous substances pollution in the Danube River Basin.
ICPDR Launches Danube Hydrological Information System
The newly launched Danube Hydrological Information System (DanubeHIS) offers near real-time and validated long-term hydrological and meteorological data for the entire Danube basin. This system is instrumental in enhancing flood risk management and supporting water-related scientific research. Explore this valuable resource and its near real-time data capabilities to better understand and manage the complexities of the Danube basin.
-
Tethys Project Programme (165.98 KB)
ICPDR to Host Kick-off Event for Tethys Project
Building on the successes of the Danube Hazard m3c project, the launch of the Tethys project is set to take place on April 11-12, 2024, in Vienna. Funded by the Danube Regional Programme, Tethys will bring together 13 project partners and 10 associated strategic partners to address hazardous substances pollution in the Danube River Basin.
Successful Biannual Danube Forecasting Forum (DAFF) Enhances Flood Forecasting
On October 10th and 11th, the much-anticipated biannual Danube Forecasting Forum (DAFF) took place in Budapest, Hungary. Organized in collaboration with the International Commission for the Protection of the Danube River (ICPDR) and the EU Joint Research Center (EU JRC), this event brought together stakeholders from the 13 countries along the Danube and members of the Danube Youth Council (DYC) under EUSDR PA5.
Slovenia's Flood Forecasting Success: Minimizing Casualties Through Effective Warning Systems
In the wake of what has been declared the nation's 'worst-ever natural disaster,’ more than 70% of Slovenia's territory, predominantly situated in the Danube River Basin, has been severely affected by extreme flooding. The scale of this catastrophe has led to billions of Euros in damages and a tragic loss of lives.
Preliminary Flood Risk Assessment (PFRA)
In accordance with Article 4 of the EU Floods Directive (FD), the first milestone in the FD basin-wide implementation is undertaking a preliminary flood risk assessment (PFRA), as well as identifying those areas for which it has been concluded that potential significant flood risks exist or might be considered likely to occur, so-called Areas of Potential Significant Flood Risk (APSFR), as in accordance with FD Article 5.
Significant Water Management Issues (SWMIS)
The EU Water Framework Directive aims to make all waters cleaner and healthier. To meet these requirements, the ICPDR's Danube River Basin Management Plan closely examines the most important pressures affecting water status.
Significant water management issues, called SWMIs, are the central pressures of basin-wide importance affecting the ecological and chemical status of surface waters, including pollution by organic substances, nutrients, and hazardous substances, as well as hydromorphological alterations. The first interim overview on the Significant Water Management Issues was created in 2007 for the 1st DRBM. The SWMIs outlined in this report were derived based on the requirements of the WFD and mainly related to quality aspects. For transboundary groundwater bodies, both qualitative and quantitative issues are addressed.-
Summary of the Danube Declaration 2022 (523.11 KB)
The 2022 Danube Declaration addresses issues with crossing the border along the Danube river, including environmental problems and the risk of flooding. It follows the rules set by the EU Water... Danube Watch 3/2021 - Danube Hazard m³c