Search Results
-
Roof Report 2003 - Annex 4 MoU with BSC (15.77 KB)
-
Roof Report 2003 - Annex 3 Political Commitment and WFD (1.31 MB)
-
Roof Report 2003 - Annex 1 Competent Authorities (52.33 KB)
-
Roof Report 2003 (254.09 KB)
-
Danube Basin Analysis 2013 - Maps (36.85 MB)
-
Danube Basin Analysis 2013 - Report (3.07 MB)
-
Danube Basin Analysis 2013 - Annex (7.7 MB)
Danube River Basin Analysis 2013
The 2013 Update of the Danube Basin Analysis provides a characterisation of the river basin district, a review of the environmental impact of human activity and an economic analysis of water use. This was first accomplished for the Danube River Basin in 2004 and is now updated. The updated assessment provides the analytical basis and is a preparatory step towards the elaboration of the Danube River Basin Management Plan - Update 2015.
Public consultation on 2015 management plans
The ICPDR supports the active involvement of stakeholders and civil society on all levels of its work. The most important work plans of the ICPDR are the Danube River Basin Management Plan and the Flood Risk Management Plan. Both were developed with a range of public consultation measures.
River Basin Management Expert Group
The River Basin Management Expert Group (RBM EG) provides guidance and coordination to ICPDR activities related to the implementation of the EU Water Framework Directive (WFD) in the Danube River Basin.