Search Results
Tethys Project Launched to Manage Hazardous Substances Pollution in the Danube River Basin
Building on the successes of the Danube Hazard m3c project, the Tethys project was launched in January 2024. Funded by the Danube Regional Programme, Tethys will bring together 13 project partners and 10 associated strategic partners to address hazardous substances pollution in the Danube River Basin.
-
Tethys Project Programme (165.98 KB)
ICPDR to Host Kick-off Event for Tethys Project
Building on the successes of the Danube Hazard m3c project, the launch of the Tethys project is set to take place on April 11-12, 2024, in Vienna. Funded by the Danube Regional Programme, Tethys will bring together 13 project partners and 10 associated strategic partners to address hazardous substances pollution in the Danube River Basin.
Significant Water Management Issues (SWMIS)
The EU Water Framework Directive aims to make all waters cleaner and healthier. To meet these requirements, the ICPDR's Danube River Basin Management Plan closely examines the most important pressures affecting water status.
Significant water management issues, called SWMIs, are the central pressures of basin-wide importance affecting the ecological and chemical status of surface waters, including pollution by organic substances, nutrients, and hazardous substances, as well as hydromorphological alterations. The first interim overview on the Significant Water Management Issues was created in 2007 for the 1st DRBM. The SWMIs outlined in this report were derived based on the requirements of the WFD and mainly related to quality aspects. For transboundary groundwater bodies, both qualitative and quantitative issues are addressed.Receiving Sea: Black Sea
The Danube River flows into the Black Sea at the Danube Delta, making the Black Sea the receiving sea for the Danube's water. A receiving sea refers to the body of water into which a river or other watercourse empties its flow. In this context, the Black Sea serves as the final destination for the waters of the Danube River.
Danube Watch 3/2021 - Danube Hazard m³c
-
Interim Overview: Significant Water Management Issues in the Danube River Basin District (583.78 KB)
Interim overview on the Significant Water Management Issues to meet the requirements of WFD (Directive 2000/60/EC) Article 14 regarding public information and consultation in preparation of developing... Danube Watch 3/2019 - Significant Water Management Issues: Let‘s Go SWMI
-
Interim Overview_SWMI Document for Consultation 2020 (746.83 KB)
Public Participation: Interim Overview on Significant Water Management Issues (SWMIs)
Vienna, 20 Dec 2019. The ICPDR provides an interim overview on Significant Water Management Issues (SWMIs) in the Danube River Basin District for the 3rd Danube River Basin Management Plan (3rd DRBMP) and invites the public to comment on this document until June 2020.