Search Results
Displaying 211 - 220 of 241 results found
-
ICPDR Operational Plan 2004/2005 (276 KB)
-
Strategy for Public Participation (342.82 KB)
Danube River Basin Strategy for Public Participation in River Basin Management Planning 2003-2009 How to be an ICPDR Observer?
The dialogue with stakeholders is important for the success of integrated river basin management in the Danube River Basin. It is therefore in the ICPDR's interest that all stakeholder groups with basin-wide interest be involved in the work of the ICPDR.
-
Staff Regulations of the ICPDR (333.01 KB)
Document No.: IC/005 Date: 29-Oct-2024 -
Job description of the Secretariat (97.31 KB)
Main Functions and Job Descriptions of the Permanent Secretariat of the ICPDR. Document No.: IC/004 -
DBA 2004 - Map 16: Protected Areas (2.95 MB)
Important Water-related Protected Areas for Species and Habitat Protection Layers: Areas for species and habitat protection ( 10,000 ha, 10,000 - 50,000 ha, > 50,000 ha), Transboundary co-operation -
DBA 2004 - Map 15: Transboundary Groundwater Bodies (3.01 MB)
Important Transboundary Groundwater Bodies Layers: Important transboundary groundwater bodies of different horizons (transboundary areas > 4000 km²) -
DBA 2004 - Map 14: Hydromorphological Alterations (3.19 MB)
Risk of failure to reach the Environmental Objectives - Hydromorphological Alterations Layers: Surface Water Bodies (Water body at risk, Water body possibly at risk, Water body not at risk) -
DBA 2004 - Map 13: Nutrient Pollution (3.2 MB)
Risk of failure to reach the Environmental Objectives - Nutrient Pollution Layers: Surface Water Bodies (Water body at risk, Water body possibly at risk, Water body not at risk) -
DBA 2004 - Map 12: Hazardous Substances (3.2 MB)
Risk of failure to reach the Environmental Objectives - Hazardous Substances Layers: Surface Water Bodies (Water body at risk, Water body possibly at risk, Water body not at risk)