Search Results
We Pass 2 Project Concludes: Restoring Migration Routes for the Danube’s Iconic Fish
The We Pass 2 project, an ambitious initiative to restore fish migration routes at the Iron Gate Dams on the Danube River, has reached a successful conclusion. Building on the achievements of the original We Pass project, We Pass 2 focused on creating preliminary designs and cost estimates for solutions to enable fish passage at Iron Gate 1 and 2, which sit on the border between Romania and Serbia.
-
Making the Iron Gate Dams Passable - We Pass 2 (1.98 MB)
The We Pass 2 project is an initiative focused on restoring fish migration routes in the Danube River Basin, particularly at the Iron Gate Dams. By addressing the barriers caused by these hydropower... -
Danube in Your Pocket (20.83 MB)
Discover the remarkable diversity of life that thrives within the Danube River Basin through our captivating map. Designed to engage and educate the general public, our map showcases the extraordinary... ICPDR Reaffirms Goals of Declaration on Achieving Functional Biodiversity in the Danube-Carpathian Region by Mainstreaming Ecological Connectivity
On 18 October 2022, the Central and Eastern Europe WWF participated in a side event on “Achieving Functional Biodiversity in the Danube-Carpathian Region by Mainstreaming Ecological Connectivity – how to make it happen” during the 11th EUSDR Annual Forum 2022. The annual forum, which took place in a hybrid format, was jointly organized by the Ukrainian EUSDR Presidency, the former Slovak EUSDR Presidency, the European Commission, and the Danube Strategy Point, with the financial support of the Danube Transnational Programme.
EU Proposes Nature Restoration Law
The European Commission proposes to cut the use of chemical pesticides in half by 2030, one of the flagship legislative proposals to follow the Biodiversity and Farm to Fork Strategies. The new rules on chemical pesticides will reduce the environmental footprint of the EU's food system, protect the health and well-being of citizens and agricultural workers, and help mitigate the pesticide use-related economic losses.
-
Interim Overview: Significant Water Management Issues in the Danube River Basin District (583.78 KB)
Interim overview on the Significant Water Management Issues to meet the requirements of WFD (Directive 2000/60/EC) Article 14 regarding public information and consultation in preparation of developing... Danube Watch 3/2019 - Significant Water Management Issues: Let‘s Go SWMI
-
Interim Overview_SWMI Document for Consultation 2020 (746.83 KB)
Public Participation: Interim Overview on Significant Water Management Issues (SWMIs)
Vienna, 20 Dec 2019. The ICPDR provides an interim overview on Significant Water Management Issues (SWMIs) in the Danube River Basin District for the 3rd Danube River Basin Management Plan (3rd DRBMP) and invites the public to comment on this document until June 2020.
-
ICPDR Sturgeon Strategy 2017 (1.3 MB)
ICPDR’s sturgeon conservation activities are strongly linked to the new EU Biodiversity Strategy.