Search Results
-
Interim Overview: Significant Water Management Issues in the Danube River Basin District (583.78 KB)
Interim overview on the Significant Water Management Issues to meet the requirements of WFD (Directive 2000/60/EC) Article 14 regarding public information and consultation in preparation of developing... Danube Watch 3/2019 - Significant Water Management Issues: Let‘s Go SWMI
-
Interim Overview_SWMI Document for Consultation 2020 (746.83 KB)
Public Participation: Interim Overview on Significant Water Management Issues (SWMIs)
Vienna, 20 Dec 2019. The ICPDR provides an interim overview on Significant Water Management Issues (SWMIs) in the Danube River Basin District for the 3rd Danube River Basin Management Plan (3rd DRBMP) and invites the public to comment on this document until June 2020.
SEE River project coming to end: report available
Vienna, 24 October 2014. The final event of the SEE River Project will be integrated with next week's 6th European River Restoration Conference at Vienna’s TechGate. The final publication of SEE River is available in print and for download. The project has lasted from October 2012 until now.
Public Participation: Interim Overview on Significant Water Management Issues
Vienna, 17 Dec 2013. The ICPDR provides an interim overview on Significant Water Management Issues in the Danube River Basin District for the 2nd Danube River Basin Management Plan (2nd DRBMP) and invites the public to comment on this document until June 2014.
-
Interim Overview Significant Water Management Issues in DRBD (527.76 KB)
New `Drava Declaration´ Signed
Maribor, 24 September 2008. A “Declaration concerning common approaches to water management, flood protection, hydropower utilization and nature and biodiversity conservation in the Drava River Basin” was adopted by Participants at the “Drava River Vision Symposium” in Maribor, Slovenia.