Search Results

Displaying 1 - 3 of 3 results found
  • Content pages

    Preliminary Flood Risk Assessment (PFRA)

    In accordance with Article 4 of the EU Floods Directive (FD), the first milestone in the FD basin-wide implementation is undertaking a preliminary flood risk assessment (PFRA), as well as identifying those areas for which it has been concluded that potential significant flood risks exist or might be considered likely to occur, so-called Areas of Potential Significant Flood Risk (APSFR), as in accordance with FD Article 5.

  • Content pages

    Public consultation on 2015 management plans

    The ICPDR supports the active involvement of stakeholders and civil society on all levels of its work. The most important work plans of the ICPDR are the Danube River Basin Management Plan and the Flood Risk Management Plan. Both were developed with a range of public consultation measures.

  • Content pages

    Public Participation on SWMIs for 2015 Management Plans: National Level

    The countries of the ICPDR provide interim overviews on Significant Water Management Issues in the Danube River Basin District for national River Basin Management Plans which are currently developed until 2015. The countries invite the public to comment on this important step 22nd June 2014. Here, we proivde links to national websites with further information.