Search Results

Displaying 1 - 10 of 11 results found
  • Content pages

    Preliminary Flood Risk Assessment (PFRA)

    In accordance with Article 4 of the EU Floods Directive (FD), the first milestone in the FD basin-wide implementation is undertaking a preliminary flood risk assessment (PFRA), as well as identifying those areas for which it has been concluded that potential significant flood risks exist or might be considered likely to occur, so-called Areas of Potential Significant Flood Risk (APSFR), as in accordance with FD Article 5.

  • Content pages

    Public Consultation 2021: Results

    This page contains all of the various documentation on outcomes from the ICPDR's Public Consultation Process for the Danube River Basin Management Plan & Danube Flood Risk Management Plan Updates 2021

  • Content pages

    Stakeholder Consultation Workshop: Our Opinion – Our Danube

    This online workshop took place on 29th/30th June 2021, with more than 130 participants attending.

  • Content pages

    Public Consultation Process towards the 2021 Management Plans Updates

    The ICPDR supports the active involvement of stakeholders and civil society on all levels of its work. Two of the most important plans to the ICPDR are the Danube River Basin Management Plan and the Flood Risk Management Plan, aiming to implement the legal requirements of WFD and FD, comprising strategic guiding plans for water management over the course of six years. Both are to be developed with a range of public consultation measures.

  • Content pages

    Flood Protection Expert Group

    The Flood Protection Expert Group (FP EG) deals with ICPDR activities concerning sustainable flood risk management and the development and implementation of the Danube River Basin Flood Risk Management Plan.

  • Content pages

    Danube FloodRisk Project

    The overall objective of the Danube FLOODRISK project was to develop and produce high quality, stakeholder oriented flood hazard and flood risk maps for the transnational Danube river floodplains to provide adequate risk information for spatial planning and economic development activities.

  • Content pages

    Flood Risk Management

    In response to the hazard of flooding, the ICPDR adopted the Action Programme for Sustainable Flood Prevention in the Danube River Basin at the ICPDR Ministerial Meeting on 13 December 2004. As a follow-up to this Action Programme, seventeen sub-basin flood action plans were published by the ICPDR in 2009.

  • Content pages

    Flood Action Plans

    17 flood action plans for all sub-basins in the Danube catchment area were prepared in 2009. They provide the first comprehensive overview of actions aiming to reduce flood risks that was ever prepared in Danube River Basin.

  • Content pages

    Slovenia

    Slovenia covers a territory of 20,273 km² and is home to just over 2 million people. It is a diverse country in terms of its landscape and climate, since it is located at the meeting point of four major European geographical regions: the Alps, the Dinaric Mountains, the Pannonian Basin and the Mediterranean. 81% of the country lies in the Danube Basin, making up 2% of the entire Danube catchment area.

  • Content pages

    Sava Basin

    The Sava is the Danube's largest tributary of the Danube in terms of discharge and the second largest in terms of catchment area. The Sava is shared by Slovenia, Croatia, Bosnia and Herzegovina, Serbia and Montenegro. The joint management arrangements acted as a pilot for the implementation of the European Union's Water Framework Directive for the Danube and Europe.