Management Plans
Here you can download all versions of the Danube River Basin Management Plans and Danube Flood Risk Management Plans of the ICPDR.
Displaying 1 - 10 of 55 items
Danube Flood Risk Management Plan (DFRMP) Update 2021
On this page you can download the Danube Flood Risk Management Plan (DFRMP) Update 2021 and all its annexes and maps. Additionally, a brochure comprises a digested and simplified version of the plan, highlighting the most important aims and visions for the future laid out in these important documents. The main document and brochure are available in both high and low resolution versions.
-
DRBMP Update 2021 Annex 21 - Financing Joint Programme of Measures (319.97 KB)
-
DRBMP Update 2021 Annex 20 - Disconnected Wetlands and Former Floodplains (255.36 KB)
Disconnected Wetlands and Former Floodplains with Potential for Reconnection -
DRBMP Update 2021 Annex 19 - Hydromorphological lighthouse projects (4.43 MB)
Hydromorphological lighthouse projects in the Danube River Basin District (2015-2021) -
DRBMP Update 2021 Annex 18 - Detailed List of Hydrological Alterations (687.94 KB)
-
DRBMP Update 2021 Annex 17 - Ecological Prioritisation Approach (490.99 KB)
Ecological Prioritisation Approach River and Habitat Continuity Restoration -
DRBMP Update 2021 Annex 16 - Progress on Measures Addressing Hydromorphological Alterations (317.6 KB)
-
DRBMP Update 2021 Annex 15 - Progress of Measure Implementation in the Agricultural Sector (411.2 KB)
-
DRBMP Update 2021 Annex 14 - Progress of Measure Implementation in Wastewater Management (306.1 KB)
Progress of Measure Implementation in Urban Wastewater and Industrial Sectors -
DRBMP Update 2021 Annex 13 - Economic Analysis (494.82 KB)