Search Results
Displaying 21 - 28 of 28 results found
-
Flood action plan for Vah, Hron and Ipel (3.16 MB)
-
Flood action plan for Morava (3.07 MB)
-
Flood action plan for Austrian Danube (4.88 MB)
-
Flood action plan of Inn (3.63 MB)
-
Flood action plan for upper Danube (3.45 MB)
Flood Action Plans
17 flood action plans for all sub-basins in the Danube catchment area were prepared in 2009. They provide the first comprehensive overview of actions aiming to reduce flood risks that was ever prepared in Danube River Basin.
-
Flood Action Programme (1.85 MB)
Action Programme for Sustainable Flood Protection in the Danube River Basin AEWS - Accident Emergency Warning System
The Accident Emergency Warning System (AEWS) of the Danube River Basin is activated whenever there is a risk of transboundary water pollution, or threshold danger levels of certain hazardous substances are exceeded.