Search Results
We Pass 2 Project Concludes: Restoring Migration Routes for the Danube’s Iconic Fish
The We Pass 2 project, an ambitious initiative to restore fish migration routes at the Iron Gate Dams on the Danube River, has reached a successful conclusion. Building on the achievements of the original We Pass project, We Pass 2 focused on creating preliminary designs and cost estimates for solutions to enable fish passage at Iron Gate 1 and 2, which sit on the border between Romania and Serbia.
-
Making the Iron Gate Dams Passable - We Pass 2 (1.98 MB)
The We Pass 2 project is an initiative focused on restoring fish migration routes in the Danube River Basin, particularly at the Iron Gate Dams. By addressing the barriers caused by these hydropower... Successful Biannual Danube Forecasting Forum (DAFF) Enhances Flood Forecasting
On October 10th and 11th, the much-anticipated biannual Danube Forecasting Forum (DAFF) took place in Budapest, Hungary. Organized in collaboration with the International Commission for the Protection of the Danube River (ICPDR) and the EU Joint Research Center (EU JRC), this event brought together stakeholders from the 13 countries along the Danube and members of the Danube Youth Council (DYC) under EUSDR PA5.
-
2021 Report on the MONERIS model application (4.73 MB)
Preliminary Flood Risk Assessment (PFRA)
In accordance with Article 4 of the EU Floods Directive (FD), the first milestone in the FD basin-wide implementation is undertaking a preliminary flood risk assessment (PFRA), as well as identifying those areas for which it has been concluded that potential significant flood risks exist or might be considered likely to occur, so-called Areas of Potential Significant Flood Risk (APSFR), as in accordance with FD Article 5.
New Study Shows Restored Floodplains Can Remove Significant Amounts of Nitrate Pollution in the Danube River Basin
A recent large-scale modelling study has shown that restoring floodplains and reconnecting cut-off water bodies with the Danube River, and its tributaries could play a significant role in improving water quality and removing nitrate pollution in the Danube River Basin.
Danube Watch 2/2021 - WePass: Explained
-
We Pass: Explained (low resolution) (9.37 MB)
A brochure explaining the findings and activities (2018 – 2021) under We Pass: Facilitating Fish Migration and Conservation at the Iron Gates. (Lower Resolution version) -
We Pass: Explained (15.01 MB)
A brochure explaining the findings and activities (2018 – 2021) under We Pass: Facilitating Fish Migration and Conservation at the Iron Gates. -
We Pass – Final Conference – Digital Poster (365.74 KB)
Poster inviting participants to register for the We Pass Final Conference. Taking place 17th & 18th November 2021.