Search Results
-
Background Paper: reducing hazardous substances (142.74 KB)
Workshop on Joint Program of Measures
Vienna, 4-5 April 2013. The ICPDR will hold a meeting to discuss the results of the Danube Joint Program of Measures, to learn about funding needs and existing potential funding for the actions, and to discuss the preparation of the Danube Basin Analysis and the 2nd Danube River Basin Management Plan.
-
Reducing Nutrient Pollution: Challenges in Agriculture (322.71 KB)
2012 interim report on implementation of Joint Program of Measures
Vienna, 10 Jan 2013. The 2012 "Interim Report on the Implementation of the Joint Program of Measures in the Danube River Basin District" was published by the ICPDR. Here you can download the document.
-
Annexes - 2012 Interim Report on the Implementation of the JPM in the DRBD (1.33 MB)
-
2012 Interim Report on the Implementation of the Joint Program of Measures in the DRBD (1.34 MB)
Joint Danube Survey
The key purpose of Joint Danube Surveys (JDS) is to produce reliable and comparable information on carefully selected elements of water quality for the length of the Danube River, including its major tributaries. Three Joint Danube Surveys have previously been conducted, in 2001, 2007, 2013, and 2019. The 5th Joint Danube Survey is due to launch on 1st July 2025.
Joint Danube Delta Survey (JDDS) ready to start
Danube Delta, 26 September 2011. A detailed analysis and assessment of the Danube Delta will be held within the project "Joint environmental monitoring, assessment and exchange of information for integrated management of the Danube delta region" from 26 September until l 7 October 2011.
-
JDS2 Final Results available (130.92 KB)
JDS2 Final Results available
Vienna, 11 September 2008 – The Danube and its tributaries are becoming cleaner, the ICPDR announced today, presenting the scientific results of the Joint Danube Survey 2 (JDS2) - possibly the world’s biggest river research expedition ever.