Search Results
Interim Report on Implementation of the Joint Program of Measures in the DRBD (2012)
Interim Report on Implementation of the Joint Program of Measures in the Danube River Basin District according to Water Framework Directive Art. 15 of 2012. Main report and relevant annexes.
Finding financing: funding options for the Joint Programme of Measures
-
Background Paper: reducing hazardous substances (142.74 KB)
Workshop on Joint Program of Measures
Vienna, 4-5 April 2013. The ICPDR will hold a meeting to discuss the results of the Danube Joint Program of Measures, to learn about funding needs and existing potential funding for the actions, and to discuss the preparation of the Danube Basin Analysis and the 2nd Danube River Basin Management Plan.
-
Reducing Nutrient Pollution: Challenges in Agriculture (322.71 KB)
2012 interim report on implementation of Joint Program of Measures
Vienna, 10 Jan 2013. The 2012 "Interim Report on the Implementation of the Joint Program of Measures in the Danube River Basin District" was published by the ICPDR. Here you can download the document.
-
Annexes - 2012 Interim Report on the Implementation of the JPM in the DRBD (1.33 MB)
-
2012 Interim Report on the Implementation of the Joint Program of Measures in the DRBD (1.34 MB)
Hazardous Substances
Hazardous substances can remain in the environment for a very long time, and harm ecosystems and human health. Although monitoring indicates that the loads of some substances have been reduced in recent years, many problems still persist. The increasing number of these man-made substances present in the environment is a matter of concern, and calls for the application of the precautionary principle.