Search Results
Tethys Project Launched to Manage Hazardous Substances Pollution in the Danube River Basin
Building on the successes of the Danube Hazard m3c project, the Tethys project was launched in January 2024. Funded by the Danube Regional Programme, Tethys will bring together 13 project partners and 10 associated strategic partners to address hazardous substances pollution in the Danube River Basin.
-
Tethys Project Programme (165.98 KB)
ICPDR to Host Kick-off Event for Tethys Project
Building on the successes of the Danube Hazard m3c project, the launch of the Tethys project is set to take place on April 11-12, 2024, in Vienna. Funded by the Danube Regional Programme, Tethys will bring together 13 project partners and 10 associated strategic partners to address hazardous substances pollution in the Danube River Basin.
-
2021 Report on the MONERIS model application (4.73 MB)
New Study Shows Restored Floodplains Can Remove Significant Amounts of Nitrate Pollution in the Danube River Basin
A recent large-scale modelling study has shown that restoring floodplains and reconnecting cut-off water bodies with the Danube River, and its tributaries could play a significant role in improving water quality and removing nitrate pollution in the Danube River Basin.
Danube Watch 3/2021 - Danube Hazard m³c
Danube Watch 3/2021 - Danube River Basin Management Plan
-
DRBMP Update 2021 - Map 39: Ecological Prioritisation Regarding Restoration Measures for River and Habitat Continuity (3.46 MB)
-
DRBMP Update 2021 - Map 38: Wetlands/Floodplains (>500 ha) with Reconnection Potential – Expected Restoration Measures by 2027 (3.26 MB)
-
DRBMP Update 2021 - Map 37: River Morphological Alterations – Expected Restoration Measures by 2027 (3.42 MB)