Search Results

Displaying 1 - 10 of 120 results found
  • News & Media

    We Pass 2 Project Concludes: Restoring Migration Routes for the Danube’s Iconic Fish

    The We Pass 2 project, an ambitious initiative to restore fish migration routes at the Iron Gate Dams on the Danube River, has reached a successful conclusion. Building on the achievements of the original We Pass project, We Pass 2 focused on creating preliminary designs and cost estimates for solutions to enable fish passage at Iron Gate 1 and 2, which sit on the border between Romania and Serbia.

  • Publications

    Making the Iron Gate Dams Passable - We Pass 2 (1.98 MB)

    The We Pass 2 project is an initiative focused on restoring fish migration routes in the Danube River Basin, particularly at the Iron Gate Dams. By addressing the barriers caused by these hydropower...
  • Content pages

    Public Consultation for the Draft Management Plan Updates 2027

    The ICPDR supports the active involvement of stakeholders and civil society on all levels of its work. Two of the most important plans to the ICPDR are the Danube River Basin Management Plan and the Flood Risk Management Plan, aiming to implement the legal requirements of Water Framework Directive (WFD) and the Floods Directive (FD), comprising strategic guiding plans for water management over the course of six years. Both are to be updated with a range of public consultation measures.

  • Content pages

    Significant Water Management Issues (SWMIS)

    The EU Water Framework Directive aims to make all waters cleaner and healthier. To meet these requirements, the ICPDR's Danube River Basin Management Plan closely examines the most important pressures affecting water status.
    Significant water management issues, called SWMIs, are the central pressures of basin-wide importance affecting the ecological and chemical status of surface waters, including pollution by organic substances, nutrients, and hazardous substances, as well as hydromorphological alterations. The first interim overview on the Significant Water Management Issues was created in 2007 for the 1st DRBM. The SWMIs outlined in this report were derived based on the requirements of the WFD and mainly related to quality aspects. For transboundary groundwater bodies, both qualitative and quantitative issues are addressed.

  • Content pages

    Stakeholder Consultation: Shaping the Future of the Danube River Basin

    The voice of our stakeholders matters in shaping the future of the Danube River Basin. As part of our commitment to effective water management and in accordance with the EU Water Framework Directive and EU Floods Directive, we invite all stakeholders to participate in this crucial process.

  • Publications

    Danube Watch 2/2021 - WePass: Explained

  • Publications

    We Pass: Explained (low resolution) (9.37 MB)

    A brochure explaining the findings and activities (2018 – 2021) under We Pass: Facilitating Fish Migration and Conservation at the Iron Gates. (Lower Resolution version)
  • Publications

    We Pass: Explained (15.01 MB)

    A brochure explaining the findings and activities (2018 – 2021) under We Pass: Facilitating Fish Migration and Conservation at the Iron Gates.
  • Publications

    IC 248 – Public Consultation Report 2021 (7.19 MB)

    Full report on the public consultation measures undertaken for the DRBMP & DFRMP Updates 2021. Included is an overview on measures, reply overview table and all original comments raised by...
  • Online Public Consultation Questionnaire Results 2021 (1.33 MB)

    Analysis and results from the online questionnaire, hosted on ICPDR.org during the public consultation period in 2021.