Search Results

Displaying 1 - 10 of 123 results found
  • Content pages

    Public Consultation for the Draft Management Plan Updates 2027

    The ICPDR supports the active involvement of stakeholders and civil society on all levels of its work. Two of the most important plans to the ICPDR are the Danube River Basin Management Plan and the Flood Risk Management Plan, aiming to implement the legal requirements of Water Framework Directive (WFD) and the Floods Directive (FD), comprising strategic guiding plans for water management over the course of six years. Both are to be updated with a range of public consultation measures.

  • News & Media

    ICPDR publishes a technical report on accidental pollution hazard

    Presenting the latest in hazard and risk assessments, the ICPDR Technical Report on Accidental Pollution Hazards provides an in-depth analysis of accidental pollution. It highlights updated inventories for Accident Hazard Sites (AHS) and Tailings Management Facilities (TMF), employing advanced methodologies like the Water Hazard Index and Tailings Risk Index. Focusing on the most hazardous sites, the report also offers key recommendations for sustainable pollution prevention

  • Publications

    Accidental Pollution Hazard in the Danube River Basin (Final Report) (1.69 MB)

    This technical report presents the results of the latest hazard and risk assessments regarding accidental pollution based on currently updated inventories, providing full technical information on...
  • News & Media

    Successful Biannual Danube Forecasting Forum (DAFF) Enhances Flood Forecasting

    On October 10th and 11th, the much-anticipated biannual Danube Forecasting Forum (DAFF) took place in Budapest, Hungary. Organized in collaboration with the International Commission for the Protection of the Danube River (ICPDR) and the EU Joint Research Center (EU JRC), this event brought together stakeholders from the 13 countries along the Danube and members of the Danube Youth Council (DYC) under EUSDR PA5.

  • Maps & Data

    Map of the Danube Accident Emergency Warning System (AEWS) (979.79 KB)

    Map 3 of the report "Transboundary Accident Prevention and Control in the Danube River Basin"
  • Content pages

    Preliminary Flood Risk Assessment (PFRA)

    In accordance with Article 4 of the EU Floods Directive (FD), the first milestone in the FD basin-wide implementation is undertaking a preliminary flood risk assessment (PFRA), as well as identifying those areas for which it has been concluded that potential significant flood risks exist or might be considered likely to occur, so-called Areas of Potential Significant Flood Risk (APSFR), as in accordance with FD Article 5.

  • Content pages

    Accident Prevention & Control

    Accidental pollution events are dangerous form of water contamination by hazardous substances. Industrial facilities, mining areas and contaminated sites that store, process or produce such substances in substantial amounts pose hazard (potential risk) to water. To avoid pollution accidents appropriate prevention measures have to be in place.

  • Content pages

    Stakeholder Consultation: Shaping the Future of the Danube River Basin

    The voice of our stakeholders matters in shaping the future of the Danube River Basin. As part of our commitment to effective water management and in accordance with the EU Water Framework Directive and EU Floods Directive, we invite all stakeholders to participate in this crucial process.

  • News & Media

    Accident Prevention and Control in the Danube River Basin: An ICPDR Technical Report Targeted to the Public

    The ICPDR has published an informative summary report on accident prevention and control for dissemination to the interested public. It highlights the ICPDR activities on basin-wide level for accident prevention and emergency management, focusing on the tools, pragmatic procedures and mechanisms that are available for the ICPDR member countries.

  • Publications

    Transboundary Accident Prevention and Control in the Danube River Basin (6.9 MB)

    An illustrative technical report for the public