Search Results

Displaying 1 - 10 of 126 results found
  • News & Media

    We Pass 2 Project Concludes: Restoring Migration Routes for the Danube’s Iconic Fish

    The We Pass 2 project, an ambitious initiative to restore fish migration routes at the Iron Gate Dams on the Danube River, has reached a successful conclusion. Building on the achievements of the original We Pass project, We Pass 2 focused on creating preliminary designs and cost estimates for solutions to enable fish passage at Iron Gate 1 and 2, which sit on the border between Romania and Serbia.

  • Publications

    Making the Iron Gate Dams Passable - We Pass 2 (1.98 MB)

    The We Pass 2 project is an initiative focused on restoring fish migration routes in the Danube River Basin, particularly at the Iron Gate Dams. By addressing the barriers caused by these hydropower...
  • News & Media

    New Report Highlights the Urgent Need for Improved Water Resilience Across Europe

    The European Environment Agency (EEA) has released its latest report, “Europe’s State of Water 2024: The Need for Improved Water Resilience,” shedding light on the growing challenges to Europe’s water security. The report, which draws on data from the 3rd River Basin Management Plans (RBMPs), highlights significant pressures on surface and groundwater bodies across Europe, emphasizing the need for immediate action to strengthen water resilience.

  • Content pages

    Public Consultation for the Draft Management Plan Updates 2027

    The ICPDR supports the active involvement of stakeholders and civil society on all levels of its work. Two of the most important plans to the ICPDR are the Danube River Basin Management Plan and the Flood Risk Management Plan, aiming to implement the legal requirements of Water Framework Directive (WFD) and the Floods Directive (FD), comprising strategic guiding plans for water management over the course of six years. Both are to be updated with a range of public consultation measures.

  • Content pages

    Stakeholder Consultation: Shaping the Future of the Danube River Basin

    The voice of our stakeholders matters in shaping the future of the Danube River Basin. As part of our commitment to effective water management and in accordance with the EU Water Framework Directive and EU Floods Directive, we invite all stakeholders to participate in this crucial process.

  • News & Media

    Severe Droughts in the Danube River Basin

    As the climate crisis worsens, severe droughts devastate European landscapes. According to the data published by the European Drought Observatory, more than 60% of land in the European Union and United Kingdom – an area nearly the same size as India (!) – is now affected by drought conditions. The Danube River Basin and the Danube itself have been affected by serious droughts in the past, e.g., in 2003, 2015, and now again one of the most feared natural phenomenon has gripped much of the Danube River Basin.

  • Publications

    Danube Watch 2/2021 - WePass: Explained

  • Legal Documents

    Danube Declaration 2022 (551.84 KB)

    Adopted at the ICPDR Ministerial Meeting on 8 February 2022. A Vision for Integrated Water Management in Our Shared Basin: Building a Sustainable Future in the Danube River Basin
  • Publications

    We Pass: Explained (low resolution) (9.37 MB)

    A brochure explaining the findings and activities (2018 – 2021) under We Pass: Facilitating Fish Migration and Conservation at the Iron Gates. (Lower Resolution version)
  • Publications

    We Pass: Explained (15.01 MB)

    A brochure explaining the findings and activities (2018 – 2021) under We Pass: Facilitating Fish Migration and Conservation at the Iron Gates.