Search Results
We Pass 2 Project Concludes: Restoring Migration Routes for the Danube’s Iconic Fish
The We Pass 2 project, an ambitious initiative to restore fish migration routes at the Iron Gate Dams on the Danube River, has reached a successful conclusion. Building on the achievements of the original We Pass project, We Pass 2 focused on creating preliminary designs and cost estimates for solutions to enable fish passage at Iron Gate 1 and 2, which sit on the border between Romania and Serbia.
-
Making the Iron Gate Dams Passable - We Pass 2 (1.98 MB)
The We Pass 2 project is an initiative focused on restoring fish migration routes in the Danube River Basin, particularly at the Iron Gate Dams. By addressing the barriers caused by these hydropower... -
2021 Report on the MONERIS model application (4.73 MB)
New Study Shows Restored Floodplains Can Remove Significant Amounts of Nitrate Pollution in the Danube River Basin
A recent large-scale modelling study has shown that restoring floodplains and reconnecting cut-off water bodies with the Danube River, and its tributaries could play a significant role in improving water quality and removing nitrate pollution in the Danube River Basin.
-
DRBMP Update 2021 - Map 26: Chemical Status of Groundwater Bodies of Basin-wide Importance (3.37 MB)
-
DRBMP Update 2021 - Map 25: Quantitative Status of Groundwater Bodies of Basin-wide Importance (3.38 MB)
-
DRBMP Update 2021 - Map 4: Transboundary Groundwater Bodies (3.96 MB)
(Press Release) World Water Day 2022: Celebrating the groundwater of our shared basin
VIENNA, 22 March – World Water Day 2022 is focusing on groundwater and making the invisible visible.
Danube Watch 2/2021 - WePass: Explained
-
We Pass: Explained (low resolution) (9.37 MB)
A brochure explaining the findings and activities (2018 – 2021) under We Pass: Facilitating Fish Migration and Conservation at the Iron Gates. (Lower Resolution version)