Search Results
-
DRBMP Update 2015 - Map 20: Heavily Modified and Artificial Surface Water Bodies (1.58 MB)
-
DRBMP Update 2015 - Map 15: Future Infrastructure Projects (1.61 MB)
-
DRBMP Update 2015 - Map 12: Hydrological Alterations – Impoundments: Current Situation 2015 (1.66 MB)
-
DRBMP Update 2015 - Map 11: Wetlands / Floodplains (>500 ha) with Reconnection Potential (1.61 MB)
-
DRBMP Update 2015 - Map 9: Alteration of River Continuity for Fish Migration – Current Situation 2015 (1.68 MB)
Practical advice for building fish migration aids
Vienna, 26 March 2013. The ICPDR has published a manual with practical advice for measures that aim to ensure fish migration at transverse structures such as dams and weirs.
-
Measures for ensuring fish migration at transverse structures (1.03 MB)
Public Participation Schedule WFD & FD
Vienna, 19 Dec 2018. According to Art. 14 of the Water Framework Directive, public participation in drafting River Basin Management Plans needs to be ensured. The ICPDR now provides a blue print for Public Participation activities for the development of the third Danube River Basin Management Plan (3rd DRBMP) until 2021 and the second Danube River Basin Flood Risk Management Plan (2nd FRMP).
-
Public Participation Schedule WFD & EFD (74.21 KB)
Workshop on River and Habitat Continuity
Vienna, 4/5 September 2012. The ICPDR held a workshop on river and habitat continuity to support the ongoing developments in the implementation of the EU Water Framework Directive and related legislation in the Danube River Basin with regard to addressing river and habitat continuity.