Search Results

Displaying 1 - 10 of 56 results found
  • News & Media

    Tethys Project Launched to Manage Hazardous Substances Pollution in the Danube River Basin

    Building on the successes of the Danube Hazard m3c project, the Tethys project was launched in January 2024. Funded by the Danube Regional Programme, Tethys will bring together 13 project partners and 10 associated strategic partners to address hazardous substances pollution in the Danube River Basin.

  • Tethys Project Programme (165.98 KB)

  • News & Media

    ICPDR to Host Kick-off Event for Tethys Project

    Building on the successes of the Danube Hazard m3c project, the launch of the Tethys project is set to take place on April 11-12, 2024, in Vienna. Funded by the Danube Regional Programme, Tethys will bring together 13 project partners and 10 associated strategic partners to address hazardous substances pollution in the Danube River Basin.

  • News & Media

    The Danube Wild Island Habitat Corridor is getting a makeover thanks to the LIFE WILDisland project

    The project involves 15 partners from 8 countries and aims to restore and conserve 34 islands from Germany to Romania. With the support of the EU Commission, the International Commission for the Protection of the Danube River, and the Ramsar Convention, the LIFE WILDisland project is set to become a great example of transboundary cooperation.

  • Content pages

    Significant Water Management Issues (SWMIS)

    The EU Water Framework Directive aims to make all waters cleaner and healthier. To meet these requirements, the ICPDR's Danube River Basin Management Plan closely examines the most important pressures affecting water status.
    Significant water management issues, called SWMIs, are the central pressures of basin-wide importance affecting the ecological and chemical status of surface waters, including pollution by organic substances, nutrients, and hazardous substances, as well as hydromorphological alterations. The first interim overview on the Significant Water Management Issues was created in 2007 for the 1st DRBM. The SWMIs outlined in this report were derived based on the requirements of the WFD and mainly related to quality aspects. For transboundary groundwater bodies, both qualitative and quantitative issues are addressed.

  • Content pages

    Hydromorphology

    Rivers, lakes, transitional and coastal waters, as well as groundwater, are vital natural resources. A significant proportion of water resources are exposed to environmental pollution or other potentially damaging pressures. Protecting and improving the waters of the Danube River Basin is therefore essential for the natural environment, the sustainable development of the region and the long-term health, well-being, and prosperity of the population.

  • News & Media

    New Study Shows Restored Floodplains Can Remove Significant Amounts of Nitrate Pollution in the Danube River Basin

    A recent large-scale modelling study has shown that restoring floodplains and reconnecting cut-off water bodies with the Danube River, and its tributaries could play a significant role in improving water quality and removing nitrate pollution in the Danube River Basin.

  • Publications

    Danube Watch 3/2021 - Dynamic LifeLines for the Danube Floodplains

  • Publications

    Danube Watch 3/2021 - Danube Hazard m³c

  • Maps & Data

    DRBMP Update 2021 - Map 39: Ecological Prioritisation Regarding Restoration Measures for River and Habitat Continuity (3.46 MB)