Search Results
We Pass 2 Project Concludes: Restoring Migration Routes for the Danube’s Iconic Fish
The We Pass 2 project, an ambitious initiative to restore fish migration routes at the Iron Gate Dams on the Danube River, has reached a successful conclusion. Building on the achievements of the original We Pass project, We Pass 2 focused on creating preliminary designs and cost estimates for solutions to enable fish passage at Iron Gate 1 and 2, which sit on the border between Romania and Serbia.
-
Making the Iron Gate Dams Passable - We Pass 2 (1.98 MB)
The We Pass 2 project is an initiative focused on restoring fish migration routes in the Danube River Basin, particularly at the Iron Gate Dams. By addressing the barriers caused by these hydropower... The Danube Wild Island Habitat Corridor is getting a makeover thanks to the LIFE WILDisland project
The project involves 15 partners from 8 countries and aims to restore and conserve 34 islands from Germany to Romania. With the support of the EU Commission, the International Commission for the Protection of the Danube River, and the Ramsar Convention, the LIFE WILDisland project is set to become a great example of transboundary cooperation.
-
Danube in Your Pocket (20.83 MB)
Discover the remarkable diversity of life that thrives within the Danube River Basin through our captivating map. Designed to engage and educate the general public, our map showcases the extraordinary... Hydromorphology
Rivers, lakes, transitional and coastal waters, as well as groundwater, are vital natural resources. A significant proportion of water resources are exposed to environmental pollution or other potentially damaging pressures. Protecting and improving the waters of the Danube River Basin is therefore essential for the natural environment, the sustainable development of the region and the long-term health, well-being, and prosperity of the population.
New Study Shows Restored Floodplains Can Remove Significant Amounts of Nitrate Pollution in the Danube River Basin
A recent large-scale modelling study has shown that restoring floodplains and reconnecting cut-off water bodies with the Danube River, and its tributaries could play a significant role in improving water quality and removing nitrate pollution in the Danube River Basin.
ICPDR Reaffirms Goals of Declaration on Achieving Functional Biodiversity in the Danube-Carpathian Region by Mainstreaming Ecological Connectivity
On 18 October 2022, the Central and Eastern Europe WWF participated in a side event on “Achieving Functional Biodiversity in the Danube-Carpathian Region by Mainstreaming Ecological Connectivity – how to make it happen” during the 11th EUSDR Annual Forum 2022. The annual forum, which took place in a hybrid format, was jointly organized by the Ukrainian EUSDR Presidency, the former Slovak EUSDR Presidency, the European Commission, and the Danube Strategy Point, with the financial support of the Danube Transnational Programme.
EU Proposes Nature Restoration Law
The European Commission proposes to cut the use of chemical pesticides in half by 2030, one of the flagship legislative proposals to follow the Biodiversity and Farm to Fork Strategies. The new rules on chemical pesticides will reduce the environmental footprint of the EU's food system, protect the health and well-being of citizens and agricultural workers, and help mitigate the pesticide use-related economic losses.
Danube Watch 3/2021 - Dynamic LifeLines for the Danube Floodplains
-
DRBMP Update 2021 - Map 39: Ecological Prioritisation Regarding Restoration Measures for River and Habitat Continuity (3.46 MB)