Search Results
Hydropower
Following a request by the Danube Ministerial Conference 2010, the ICPDR has become active in initiating a dialogue with representatives from the hydropower sector. As an essential step in this process, "Guiding Principles on Sustainable Hydropower Development in the Danube Basin" have been developed by an interdisciplinary team and were finalised and adopted in June 2013.
1st ICPDR Workshop on Hydropower and Water Management
Timişoara, 21/22 February 2012. Cooperation on navigation is already ongoing and has now been launched for hydropower: efforts are needed in creating win-win situations and benefits for all actors involved. The 1st ICPDR Workshop on Hydropower and Water Management was organised by Romania (Apele Romane) in close cooperation with the other two Lead Countries Austria and Slovenia and the ICPDR.
-
ToR PM EG (270.1 KB)
Terms of Reference of the Pressures and Measures Expert Group (PM EG), IC-105 rev3-final 2016 Power from the Danube – can it be sustainable?
-
MONERIS User's Manual - Part 2 (3.96 MB)
Version 2.0, July 2007 -
MONERIS User's Manual - Part 1 (3.45 MB)
Version 2.0, July 2007 The heavy price tag for clean water
Article in Danube Watch 02/2006
-
DBA 2004 - Map 13: Nutrient Pollution (3.2 MB)
Risk of failure to reach the Environmental Objectives - Nutrient Pollution Layers: Surface Water Bodies (Water body at risk, Water body possibly at risk, Water body not at risk) -
DBA 2004 - Map 12: Hazardous Substances (3.2 MB)
Risk of failure to reach the Environmental Objectives - Hazardous Substances Layers: Surface Water Bodies (Water body at risk, Water body possibly at risk, Water body not at risk) -
DBA 2004 - Map 11: Organic Pollution (3.19 MB)
Risk of failure to reach the Environmental Objectives - Organic Pollution Layers: Surface Water Bodies (Water body at risk, Water body possibly at risk, Water body not at risk)