Search Results
Public Consultation for the Draft Management Plan Updates 2027
The ICPDR supports the active involvement of stakeholders and civil society on all levels of its work. Two of the most important plans to the ICPDR are the Danube River Basin Management Plan and the Flood Risk Management Plan, aiming to implement the legal requirements of Water Framework Directive (WFD) and the Floods Directive (FD), comprising strategic guiding plans for water management over the course of six years. Both are to be updated with a range of public consultation measures.
Flood Hazard and Risk Maps
According to Floods Directive, the Member States shall, at the level of the river basin district or unit of management, prepare flood hazard maps and flood risk maps at the most appropriate scale for the areas identified under Article 5(1).
Stakeholder Consultation: Shaping the Future of the Danube River Basin
The voice of our stakeholders matters in shaping the future of the Danube River Basin. As part of our commitment to effective water management and in accordance with the EU Water Framework Directive and EU Floods Directive, we invite all stakeholders to participate in this crucial process.
Danube Watch 3/2021 - The Ministers of the Danube
-
DRBMP Update 2021 - Map 39: Ecological Prioritisation Regarding Restoration Measures for River and Habitat Continuity (3.46 MB)
-
DRBMP Update 2021 - Map 38: Wetlands/Floodplains (>500 ha) with Reconnection Potential – Expected Restoration Measures by 2027 (3.26 MB)
-
DRBMP Update 2021 - Map 37: River Morphological Alterations – Expected Restoration Measures by 2027 (3.42 MB)
-
DRBMP Update 2021 - Map 36: Interruptions of River Continuity for Fish Migration – Expected Restoration Measures by 2027 (3.4 MB)
-
DRBMP Update 2021 - Map 35: Hydrological Alterations - Hydropeaking – Expected Restoration Measures by 2027 (3.25 MB)
-
DRBMP Update 2021 - Map 34: Hydrological Alterations - Water Abstractions – Expected Restoration Measures by 2027 (3.25 MB)