Search Results
We Pass 2 Project Concludes: Restoring Migration Routes for the Danube’s Iconic Fish
The We Pass 2 project, an ambitious initiative to restore fish migration routes at the Iron Gate Dams on the Danube River, has reached a successful conclusion. Building on the achievements of the original We Pass project, We Pass 2 focused on creating preliminary designs and cost estimates for solutions to enable fish passage at Iron Gate 1 and 2, which sit on the border between Romania and Serbia.
-
Making the Iron Gate Dams Passable - We Pass 2 (1.98 MB)
The We Pass 2 project is an initiative focused on restoring fish migration routes in the Danube River Basin, particularly at the Iron Gate Dams. By addressing the barriers caused by these hydropower... -
Terms of Reference - Technical Expert for Water Management-Pollution Control at the ICPDR Secretariat (223.13 KB)
Terms of Reference for the Open Position of Technical Expert for Water Management-Pollution Control at the ICPDR Secretariat -
Terms of Reference for the Open Position of GIS Expert at the ICPDR Secretariat (221.91 KB)
Terms of Reference for the Open Position of GIS Expert at the ICPDR Secretariat. The Danube Wild Island Habitat Corridor is getting a makeover thanks to the LIFE WILDisland project
The project involves 15 partners from 8 countries and aims to restore and conserve 34 islands from Germany to Romania. With the support of the EU Commission, the International Commission for the Protection of the Danube River, and the Ramsar Convention, the LIFE WILDisland project is set to become a great example of transboundary cooperation.
Hydromorphology
Rivers, lakes, transitional and coastal waters, as well as groundwater, are vital natural resources. A significant proportion of water resources are exposed to environmental pollution or other potentially damaging pressures. Protecting and improving the waters of the Danube River Basin is therefore essential for the natural environment, the sustainable development of the region and the long-term health, well-being, and prosperity of the population.
ICPDR Executive Secretary Continues her Tour of the Danube with Slovenian Visit
With the start of her tenure as our Executive Secretary last summer, Birgit Vogel has set out to prioritize building solid professional relationships with ICPDR stakeholders and members, planning to personally visit as many Danube countries as possible. Ms. Vogel met with Uroš Brežan. Slovenian Water Minister, and a broad range of water actors on her latest visit to Slovenia.
New Study Shows Restored Floodplains Can Remove Significant Amounts of Nitrate Pollution in the Danube River Basin
A recent large-scale modelling study has shown that restoring floodplains and reconnecting cut-off water bodies with the Danube River, and its tributaries could play a significant role in improving water quality and removing nitrate pollution in the Danube River Basin.
Danube Watch 3/2021 - Dynamic LifeLines for the Danube Floodplains
-
DRBMP Update 2021 - Map 39: Ecological Prioritisation Regarding Restoration Measures for River and Habitat Continuity (3.46 MB)