Search Results
We Pass 2 Project Concludes: Restoring Migration Routes for the Danube’s Iconic Fish
The We Pass 2 project, an ambitious initiative to restore fish migration routes at the Iron Gate Dams on the Danube River, has reached a successful conclusion. Building on the achievements of the original We Pass project, We Pass 2 focused on creating preliminary designs and cost estimates for solutions to enable fish passage at Iron Gate 1 and 2, which sit on the border between Romania and Serbia.
-
Making the Iron Gate Dams Passable - We Pass 2 (1.98 MB)
The We Pass 2 project is an initiative focused on restoring fish migration routes in the Danube River Basin, particularly at the Iron Gate Dams. By addressing the barriers caused by these hydropower... Receiving Sea: Black Sea
The Danube River flows into the Black Sea at the Danube Delta, making the Black Sea the receiving sea for the Danube's water. A receiving sea refers to the body of water into which a river or other watercourse empties its flow. In this context, the Black Sea serves as the final destination for the waters of the Danube River.
Danube Watch 3/2021 - Danube River Basin Management Plan
-
DRBMP Update 2021 - Map 39: Ecological Prioritisation Regarding Restoration Measures for River and Habitat Continuity (3.46 MB)
-
DRBMP Update 2021 - Map 38: Wetlands/Floodplains (>500 ha) with Reconnection Potential – Expected Restoration Measures by 2027 (3.26 MB)
-
DRBMP Update 2021 - Map 37: River Morphological Alterations – Expected Restoration Measures by 2027 (3.42 MB)
-
DRBMP Update 2021 - Map 36: Interruptions of River Continuity for Fish Migration – Expected Restoration Measures by 2027 (3.4 MB)
-
DRBMP Update 2021 - Map 35: Hydrological Alterations - Hydropeaking – Expected Restoration Measures by 2027 (3.25 MB)
-
DRBMP Update 2021 - Map 34: Hydrological Alterations - Water Abstractions – Expected Restoration Measures by 2027 (3.25 MB)