Search Results
We Pass 2 Project Concludes: Restoring Migration Routes for the Danube’s Iconic Fish
The We Pass 2 project, an ambitious initiative to restore fish migration routes at the Iron Gate Dams on the Danube River, has reached a successful conclusion. Building on the achievements of the original We Pass project, We Pass 2 focused on creating preliminary designs and cost estimates for solutions to enable fish passage at Iron Gate 1 and 2, which sit on the border between Romania and Serbia.
-
Making the Iron Gate Dams Passable - We Pass 2 (1.98 MB)
The We Pass 2 project is an initiative focused on restoring fish migration routes in the Danube River Basin, particularly at the Iron Gate Dams. By addressing the barriers caused by these hydropower... Significant Water Management Issues (SWMIS)
The EU Water Framework Directive aims to make all waters cleaner and healthier. To meet these requirements, the ICPDR's Danube River Basin Management Plan closely examines the most important pressures affecting water status.
Significant water management issues, called SWMIs, are the central pressures of basin-wide importance affecting the ecological and chemical status of surface waters, including pollution by organic substances, nutrients, and hazardous substances, as well as hydromorphological alterations. The first interim overview on the Significant Water Management Issues was created in 2007 for the 1st DRBM. The SWMIs outlined in this report were derived based on the requirements of the WFD and mainly related to quality aspects. For transboundary groundwater bodies, both qualitative and quantitative issues are addressed.Receiving Sea: Black Sea
The Danube River flows into the Black Sea at the Danube Delta, making the Black Sea the receiving sea for the Danube's water. A receiving sea refers to the body of water into which a river or other watercourse empties its flow. In this context, the Black Sea serves as the final destination for the waters of the Danube River.
Danube Watch 2/2021 - WePass: Explained
-
We Pass: Explained (low resolution) (9.37 MB)
A brochure explaining the findings and activities (2018 – 2021) under We Pass: Facilitating Fish Migration and Conservation at the Iron Gates. (Lower Resolution version) -
We Pass: Explained (15.01 MB)
A brochure explaining the findings and activities (2018 – 2021) under We Pass: Facilitating Fish Migration and Conservation at the Iron Gates. -
We Pass – Final Conference – Digital Poster (365.74 KB)
Poster inviting participants to register for the We Pass Final Conference. Taking place 17th & 18th November 2021. -
Interim Overview: Significant Water Management Issues in the Danube River Basin District (583.78 KB)
Interim overview on the Significant Water Management Issues to meet the requirements of WFD (Directive 2000/60/EC) Article 14 regarding public information and consultation in preparation of developing... Danube Watch 3/2019 - Significant Water Management Issues: Let‘s Go SWMI