Search Results
We Pass 2 Project Concludes: Restoring Migration Routes for the Danube’s Iconic Fish
The We Pass 2 project, an ambitious initiative to restore fish migration routes at the Iron Gate Dams on the Danube River, has reached a successful conclusion. Building on the achievements of the original We Pass project, We Pass 2 focused on creating preliminary designs and cost estimates for solutions to enable fish passage at Iron Gate 1 and 2, which sit on the border between Romania and Serbia.
-
Making the Iron Gate Dams Passable - We Pass 2 (1.98 MB)
The We Pass 2 project is an initiative focused on restoring fish migration routes in the Danube River Basin, particularly at the Iron Gate Dams. By addressing the barriers caused by these hydropower... Sub-basins
Sub-basins are smaller working units within a larger river basin or catchment area. They represent a distinct geographical area that is delineated based on the natural drainage patterns of rivers and their tributaries. Sub-basins are used to facilitate the management and assessment of water resources, allowing for more focused and localized analysis and planning within the broader context of the overall river basin.
Danube Watch 3/2021 - WACOM: Water Contingency Management in the Sava River Basin
Danube Watch 2/2021 - WePass: Explained
-
We Pass: Explained (low resolution) (9.37 MB)
A brochure explaining the findings and activities (2018 – 2021) under We Pass: Facilitating Fish Migration and Conservation at the Iron Gates. (Lower Resolution version) -
We Pass: Explained (15.01 MB)
A brochure explaining the findings and activities (2018 – 2021) under We Pass: Facilitating Fish Migration and Conservation at the Iron Gates. -
We Pass – Final Conference – Digital Poster (365.74 KB)
Poster inviting participants to register for the We Pass Final Conference. Taking place 17th & 18th November 2021. -
Updated Integrated Tisza River Basin Management Plan 2019 - Maps (44.99 MB)
-
Updated Integrated Tisza River Basin Management Plan 2019 - Annexes (8.08 MB)