Search Results

Displaying 1 - 10 of 145 results found
  • News & Media

    We Pass 2 Project Concludes: Restoring Migration Routes for the Danube’s Iconic Fish

    The We Pass 2 project, an ambitious initiative to restore fish migration routes at the Iron Gate Dams on the Danube River, has reached a successful conclusion. Building on the achievements of the original We Pass project, We Pass 2 focused on creating preliminary designs and cost estimates for solutions to enable fish passage at Iron Gate 1 and 2, which sit on the border between Romania and Serbia.

  • Publications

    Making the Iron Gate Dams Passable - We Pass 2 (1.98 MB)

    The We Pass 2 project is an initiative focused on restoring fish migration routes in the Danube River Basin, particularly at the Iron Gate Dams. By addressing the barriers caused by these hydropower...
  • News & Media

    Successful Biannual Danube Forecasting Forum (DAFF) Enhances Flood Forecasting

    On October 10th and 11th, the much-anticipated biannual Danube Forecasting Forum (DAFF) took place in Budapest, Hungary. Organized in collaboration with the International Commission for the Protection of the Danube River (ICPDR) and the EU Joint Research Center (EU JRC), this event brought together stakeholders from the 13 countries along the Danube and members of the Danube Youth Council (DYC) under EUSDR PA5.

  • Content pages

    Preliminary Flood Risk Assessment (PFRA)

    In accordance with Article 4 of the EU Floods Directive (FD), the first milestone in the FD basin-wide implementation is undertaking a preliminary flood risk assessment (PFRA), as well as identifying those areas for which it has been concluded that potential significant flood risks exist or might be considered likely to occur, so-called Areas of Potential Significant Flood Risk (APSFR), as in accordance with FD Article 5.

  • Content pages

    Sub-basins

    Sub-basins are smaller working units within a larger river basin or catchment area. They represent a distinct geographical area that is delineated based on the natural drainage patterns of rivers and their tributaries. Sub-basins are used to facilitate the management and assessment of water resources, allowing for more focused and localized analysis and planning within the broader context of the overall river basin.

  • Publications

    Danube Watch 3/2021 - WACOM: Water Contingency Management in the Sava River Basin

  • Publications

    Danube Watch 2/2021 - WePass: Explained

  • Publications

    We Pass: Explained (low resolution) (9.37 MB)

    A brochure explaining the findings and activities (2018 – 2021) under We Pass: Facilitating Fish Migration and Conservation at the Iron Gates. (Lower Resolution version)
  • Publications

    We Pass: Explained (15.01 MB)

    A brochure explaining the findings and activities (2018 – 2021) under We Pass: Facilitating Fish Migration and Conservation at the Iron Gates.
  • We Pass – Final Conference – Digital Poster (365.74 KB)

    Poster inviting participants to register for the We Pass Final Conference. Taking place 17th & 18th November 2021.