Search Results
Ukraine Adopts Nine River Basin Management Plans: A Major Milestone Towards Sustainable Water Management
Ukraine, one of the 15 ICPDR contracting parties, has officially adopted all its nine River Basin Management Plans (RBMPs), marking a significant step towards sustainable water management in line with European Union (EU) and international standards.
Statement by the ICPDR on the Situation Around Ukrainian Ports on the Lower Danube
VIENNA, 29 August (ICPDR) – The International Commission for the Protection of the Danube River (ICPDR) is committed to maintaining and preserving the cleanliness, health, and safety of the Danube River Basin.
Flood Hazard and Risk Maps
According to Floods Directive, the Member States shall, at the level of the river basin district or unit of management, prepare flood hazard maps and flood risk maps at the most appropriate scale for the areas identified under Article 5(1).
Significant Water Management Issues (SWMIS)
The EU Water Framework Directive aims to make all waters cleaner and healthier. To meet these requirements, the ICPDR's Danube River Basin Management Plan closely examines the most important pressures affecting water status.
Significant water management issues, called SWMIs, are the central pressures of basin-wide importance affecting the ecological and chemical status of surface waters, including pollution by organic substances, nutrients, and hazardous substances, as well as hydromorphological alterations. The first interim overview on the Significant Water Management Issues was created in 2007 for the 1st DRBM. The SWMIs outlined in this report were derived based on the requirements of the WFD and mainly related to quality aspects. For transboundary groundwater bodies, both qualitative and quantitative issues are addressed.-
DRBMP Update 2021 - Map 39: Ecological Prioritisation Regarding Restoration Measures for River and Habitat Continuity (3.46 MB)
-
DRBMP Update 2021 - Map 38: Wetlands/Floodplains (>500 ha) with Reconnection Potential – Expected Restoration Measures by 2027 (3.26 MB)
-
DRBMP Update 2021 - Map 37: River Morphological Alterations – Expected Restoration Measures by 2027 (3.42 MB)
-
DRBMP Update 2021 - Map 36: Interruptions of River Continuity for Fish Migration – Expected Restoration Measures by 2027 (3.4 MB)
-
DRBMP Update 2021 - Map 35: Hydrological Alterations - Hydropeaking – Expected Restoration Measures by 2027 (3.25 MB)
-
DRBMP Update 2021 - Map 34: Hydrological Alterations - Water Abstractions – Expected Restoration Measures by 2027 (3.25 MB)