Search Results
Displaying 1 - 10 of 156 results found
We Pass 2 Project Concludes: Restoring Migration Routes for the Danube’s Iconic Fish
The We Pass 2 project, an ambitious initiative to restore fish migration routes at the Iron Gate Dams on the Danube River, has reached a successful conclusion. Building on the achievements of the original We Pass project, We Pass 2 focused on creating preliminary designs and cost estimates for solutions to enable fish passage at Iron Gate 1 and 2, which sit on the border between Romania and Serbia.
-
Making the Iron Gate Dams Passable - We Pass 2 (1.98 MB)
The We Pass 2 project is an initiative focused on restoring fish migration routes in the Danube River Basin, particularly at the Iron Gate Dams. By addressing the barriers caused by these hydropower... Danube Watch 3/2021 - Danube River Basin Management Plan
-
DRBMP Update 2021 - Map 39: Ecological Prioritisation Regarding Restoration Measures for River and Habitat Continuity (3.46 MB)
-
DRBMP Update 2021 - Map 38: Wetlands/Floodplains (>500 ha) with Reconnection Potential – Expected Restoration Measures by 2027 (3.26 MB)
-
DRBMP Update 2021 - Map 37: River Morphological Alterations – Expected Restoration Measures by 2027 (3.42 MB)
-
DRBMP Update 2021 - Map 36: Interruptions of River Continuity for Fish Migration – Expected Restoration Measures by 2027 (3.4 MB)
-
DRBMP Update 2021 - Map 35: Hydrological Alterations - Hydropeaking – Expected Restoration Measures by 2027 (3.25 MB)
-
DRBMP Update 2021 - Map 34: Hydrological Alterations - Water Abstractions – Expected Restoration Measures by 2027 (3.25 MB)
-
DRBMP Update 2021 - Map 33: Hydrological Alterations - Impoundments – Expected Restoration Measures by 2027 (3.27 MB)