Search Results
We Pass 2 Project Concludes: Restoring Migration Routes for the Danube’s Iconic Fish
The We Pass 2 project, an ambitious initiative to restore fish migration routes at the Iron Gate Dams on the Danube River, has reached a successful conclusion. Building on the achievements of the original We Pass project, We Pass 2 focused on creating preliminary designs and cost estimates for solutions to enable fish passage at Iron Gate 1 and 2, which sit on the border between Romania and Serbia.
-
Making the Iron Gate Dams Passable - We Pass 2 (1.98 MB)
The We Pass 2 project is an initiative focused on restoring fish migration routes in the Danube River Basin, particularly at the Iron Gate Dams. By addressing the barriers caused by these hydropower... Public Consultation for the Draft Management Plan Updates 2027
The ICPDR supports the active involvement of stakeholders and civil society on all levels of its work. Two of the most important plans to the ICPDR are the Danube River Basin Management Plan and the Flood Risk Management Plan, aiming to implement the legal requirements of Water Framework Directive (WFD) and the Floods Directive (FD), comprising strategic guiding plans for water management over the course of six years. Both are to be updated with a range of public consultation measures.
-
Danube in Your Pocket (20.83 MB)
Discover the remarkable diversity of life that thrives within the Danube River Basin through our captivating map. Designed to engage and educate the general public, our map showcases the extraordinary... Stakeholder Consultation: Shaping the Future of the Danube River Basin
The voice of our stakeholders matters in shaping the future of the Danube River Basin. As part of our commitment to effective water management and in accordance with the EU Water Framework Directive and EU Floods Directive, we invite all stakeholders to participate in this crucial process.
ICPDR Reaffirms Goals of Declaration on Achieving Functional Biodiversity in the Danube-Carpathian Region by Mainstreaming Ecological Connectivity
On 18 October 2022, the Central and Eastern Europe WWF participated in a side event on “Achieving Functional Biodiversity in the Danube-Carpathian Region by Mainstreaming Ecological Connectivity – how to make it happen” during the 11th EUSDR Annual Forum 2022. The annual forum, which took place in a hybrid format, was jointly organized by the Ukrainian EUSDR Presidency, the former Slovak EUSDR Presidency, the European Commission, and the Danube Strategy Point, with the financial support of the Danube Transnational Programme.
EU Proposes Nature Restoration Law
The European Commission proposes to cut the use of chemical pesticides in half by 2030, one of the flagship legislative proposals to follow the Biodiversity and Farm to Fork Strategies. The new rules on chemical pesticides will reduce the environmental footprint of the EU's food system, protect the health and well-being of citizens and agricultural workers, and help mitigate the pesticide use-related economic losses.
-
IC 248 – Public Consultation Report 2021 (7.19 MB)
Full report on the public consultation measures undertaken for the DRBMP & DFRMP Updates 2021. Included is an overview on measures, reply overview table and all original comments raised by... -
Online Public Consultation Questionnaire Results 2021 (1.33 MB)
Analysis and results from the online questionnaire, hosted on ICPDR.org during the public consultation period in 2021. -
DRBMP Consultation 2021: EBU (152.48 KB)