Search Results

Displaying 1 - 10 of 34 results found
  • News & Media

    We Pass 2 Project Concludes: Restoring Migration Routes for the Danube’s Iconic Fish

    The We Pass 2 project, an ambitious initiative to restore fish migration routes at the Iron Gate Dams on the Danube River, has reached a successful conclusion. Building on the achievements of the original We Pass project, We Pass 2 focused on creating preliminary designs and cost estimates for solutions to enable fish passage at Iron Gate 1 and 2, which sit on the border between Romania and Serbia.

  • Publications

    Making the Iron Gate Dams Passable - We Pass 2 (1.98 MB)

    The We Pass 2 project is an initiative focused on restoring fish migration routes in the Danube River Basin, particularly at the Iron Gate Dams. By addressing the barriers caused by these hydropower...
  • News & Media

    New Report Highlights the Urgent Need for Improved Water Resilience Across Europe

    The European Environment Agency (EEA) has released its latest report, “Europe’s State of Water 2024: The Need for Improved Water Resilience,” shedding light on the growing challenges to Europe’s water security. The report, which draws on data from the 3rd River Basin Management Plans (RBMPs), highlights significant pressures on surface and groundwater bodies across Europe, emphasizing the need for immediate action to strengthen water resilience.

  • News & Media

    Severe Droughts in the Danube River Basin

    As the climate crisis worsens, severe droughts devastate European landscapes. According to the data published by the European Drought Observatory, more than 60% of land in the European Union and United Kingdom – an area nearly the same size as India (!) – is now affected by drought conditions. The Danube River Basin and the Danube itself have been affected by serious droughts in the past, e.g., in 2003, 2015, and now again one of the most feared natural phenomenon has gripped much of the Danube River Basin.

  • Publications

    Danube Watch 2/2021 - WePass: Explained

  • Legal Documents

    Danube Declaration 2022 (551.84 KB)

    Adopted at the ICPDR Ministerial Meeting on 8 February 2022. A Vision for Integrated Water Management in Our Shared Basin: Building a Sustainable Future in the Danube River Basin
  • Publications

    We Pass: Explained (low resolution) (9.37 MB)

    A brochure explaining the findings and activities (2018 – 2021) under We Pass: Facilitating Fish Migration and Conservation at the Iron Gates. (Lower Resolution version)
  • Publications

    We Pass: Explained (15.01 MB)

    A brochure explaining the findings and activities (2018 – 2021) under We Pass: Facilitating Fish Migration and Conservation at the Iron Gates.
  • We Pass – Final Conference – Digital Poster (365.74 KB)

    Poster inviting participants to register for the We Pass Final Conference. Taking place 17th & 18th November 2021.
  • Content pages

    WE PASS - Facilitating Fish Migration and Conservation at the Iron Gates

    We Pass was an initiative aiming to facilitate fish migration in the Danube River Basin, set up by the ICPDR, Jaroslav Černi Institute, DDNI, CDM SMITH, OAK Consultants, and the Norwegian Institute for Nature Research. The focus was on the preservation and reestablishment of endangered fish species migration routes in the Danube River, its tributaries, and specifically at the Iron Gates.