Search Results
ICPDR publishes a technical report on accidental pollution hazard
Presenting the latest in hazard and risk assessments, the ICPDR Technical Report on Accidental Pollution Hazards provides an in-depth analysis of accidental pollution. It highlights updated inventories for Accident Hazard Sites (AHS) and Tailings Management Facilities (TMF), employing advanced methodologies like the Water Hazard Index and Tailings Risk Index. Focusing on the most hazardous sites, the report also offers key recommendations for sustainable pollution prevention
-
Accidental Pollution Hazard in the Danube River Basin (Final Report) (1.69 MB)
This technical report presents the results of the latest hazard and risk assessments regarding accidental pollution based on currently updated inventories, providing full technical information on... -
Map of the Danube Accident Emergency Warning System (AEWS) (979.79 KB)
Map 3 of the report "Transboundary Accident Prevention and Control in the Danube River Basin" Accident Prevention & Control
Accidental pollution events are dangerous form of water contamination by hazardous substances. Industrial facilities, mining areas and contaminated sites that store, process or produce such substances in substantial amounts pose hazard (potential risk) to water. To avoid pollution accidents appropriate prevention measures have to be in place.
Serbia takes over ICPDR Presidency from Romania for 2023
(Press Release) VIENNA, 28 February (International Commission for the Protection of the Danube River) – Serbia has now taken over the Presidency of the International Commission for the Protection of the Danube River (ICPDR) and has announced its priorities for the upcoming term. Incoming President Vedrana Ilić who is Serbia’s Assistant Minister responsible for international relations at the Ministry of Agriculture, Forestry and Water Management, presented Serbia’s goals hopes for its tenure, during an online ceremony.
Accident Prevention and Control in the Danube River Basin: An ICPDR Technical Report Targeted to the Public
The ICPDR has published an informative summary report on accident prevention and control for dissemination to the interested public. It highlights the ICPDR activities on basin-wide level for accident prevention and emergency management, focusing on the tools, pragmatic procedures and mechanisms that are available for the ICPDR member countries.
-
Transboundary Accident Prevention and Control in the Danube River Basin (6.9 MB)
An illustrative technical report for the public Danube Watch 3/2021 - WACOM: Water Contingency Management in the Sava River Basin
Danube Watch 3/2021 - The Danube TMF Project
-
DRBMP Update 2021 - Map 9b: Tailings Management Facilities (TMF) and Water-related Protected Areas (3.8 MB)