Search Results
Slovenia's Flood Forecasting Success: Minimizing Casualties Through Effective Warning Systems
In the wake of what has been declared the nation's 'worst-ever natural disaster,’ more than 70% of Slovenia's territory, predominantly situated in the Danube River Basin, has been severely affected by extreme flooding. The scale of this catastrophe has led to billions of Euros in damages and a tragic loss of lives.
Danube Watch 3/2021 - WACOM: Water Contingency Management in the Sava River Basin
-
Report on the Ice Event 2017 in the Danube River Basin (6.97 MB)
Freezing weather conditions in the winter months have been a fact of life on the Danube since time immemorial, but the months of January and February 2017 saw many countries in the Danube Basin and... ICPDR Releases "Ice Report 2017"
Freezing weather conditions in the winter months have been a fact of life on the Danube since time immemorial, but the months of January and February 2017 saw many countries in the Danube Basin and its tributaries facing an especially bleak situation.
Solutions for a frozen river: cross border ice control on the Danube
Ice control has a long history on the Danube river. The extremely low temperatures experienced in the past weeks throughout the Danube River basin which have been causing continuous ice formation on the Danube are reminding us of the importance of cross-border cooperation.
-
Danube Declaration 2016 (214.47 KB)
Adopted at the ICPDR Ministerial Meeting on 9 February 2016: Water Management in the Danube River Basin: Integration and Solidarity in the most international river basin of the world Danube River Basin Management Plan (DRBMP) Update 2015
Since the publication of the first Danube River Basin Management Plan (DRBMP) in 2009, the ICPDR updates the DRBMP every six years as requested by the EU Water Framework Directive. On this page you can download the Danube River Basin Management Plan (DRBMP) Update 2015 and all its annexes and maps.
-
DRBMP Update 2015 - Map 37: Hydrological Alterations – Expected Improvements by 2021 (1.67 MB)
-
DRBMP Update 2015 - Map 36: Alteration of River Morphology – Expected Improvements by 2021 (1.56 MB)
-
DRBMP Update 2015 - Map 35: Ecological Prioritisation Regarding Restoration Measures for River and Habitat Continuity (1.82 MB)