Search Results
-
2021 Report on the MONERIS model application (4.73 MB)
New Study Shows Restored Floodplains Can Remove Significant Amounts of Nitrate Pollution in the Danube River Basin
A recent large-scale modelling study has shown that restoring floodplains and reconnecting cut-off water bodies with the Danube River, and its tributaries could play a significant role in improving water quality and removing nitrate pollution in the Danube River Basin.
How do you take a scientific selfie of an International River? ICPDR Participates at Austria-wide Long Night of Research
On 20th May 2022, the ICPDR along with other UN-based organizations, including CTBTO, IAEA, IOM, UNIDO, UNODA and UNODC, participated in this year’s “Long Night of Research” (“Lange Nacht der Forschung”) Austria’s biggest science event for the public.
High Level Conference for the Protection of Sturgeons hosted under the Austrian Presidency of the EU
Vienna, 10 July 2018 (Press Release) - An international event took place on 9th and 10th July in Vienna within the framework of the Austrian Presidency of the EU. In attendance were 50 experts from national administrations, EU and international institutions, academia and NGO representatives, who can all potentially provide the long-term framework of action indispensable for the conservation of sturgeon stocks in Europe.
-
Danube Declaration 2016 (214.47 KB)
Adopted at the ICPDR Ministerial Meeting on 9 February 2016: Water Management in the Danube River Basin: Integration and Solidarity in the most international river basin of the world Danube River Basin Management Plan (DRBMP) Update 2015
Since the publication of the first Danube River Basin Management Plan (DRBMP) in 2009, the ICPDR updates the DRBMP every six years as requested by the EU Water Framework Directive. On this page you can download the Danube River Basin Management Plan (DRBMP) Update 2015 and all its annexes and maps.
-
DRBMP Update 2015 - Map 37: Hydrological Alterations – Expected Improvements by 2021 (1.67 MB)
-
DRBMP Update 2015 - Map 36: Alteration of River Morphology – Expected Improvements by 2021 (1.56 MB)
-
DRBMP Update 2015 - Map 35: Ecological Prioritisation Regarding Restoration Measures for River and Habitat Continuity (1.82 MB)
-
DRBMP Update 2015 - Map 34: Alteration of River Continuity for Fish Migration – Expected Improvements by 2021 (2.04 MB)