Search Results
From the Source to the Sea: The TID(Y)UP Project Aims to Eliminate Plastic Pollution in Rivers
Despite the EU's advanced waste management and ambitious recycling objectives, studies still indicate the presence of macro and microplastic pollution in EU rivers. The Tid(y)Up project focuses on improving water quality and reducing plastic pollution in the Tisza River, which is long considered one of Europe’s most heavily contaminated rivers.
DANUBE4all Project: A Brighter Future for our Danube
The project aims to restore the Danube River Basin for ecosystems and people, an EU ‘Lighthouse Initiative’ supporting the Mission to “Restore our ocean and waters by 2030."Launched in January 2023, DANUBE4all is a 5-year EU "Lighthouse Initiative" project funded by Horizon Europe, aiming to restore freshwater ecosystems in the Danube River Basin.
Hydromorphology
Rivers, lakes, transitional and coastal waters, as well as groundwater, are vital natural resources. A significant proportion of water resources are exposed to environmental pollution or other potentially damaging pressures. Protecting and improving the waters of the Danube River Basin is therefore essential for the natural environment, the sustainable development of the region and the long-term health, well-being, and prosperity of the population.
-
Danube Flood Risk Management Plan - Update 2021 - Annexes 2-6 (4.62 MB)
-
Danube River Basin Management Plan - Update 2021 - Maps (36.75 MB)
2021 Updates to Danube River Basin & Flood Risk Management Plans Published
Vienna, 21 December 2021. Prioritising water management issues for the Danube River Basin until 2027, the ICPDR has adopted the Danube River Basin Management Plan (DRBMP) Update 2021 together with the Danube Flood Risk Management Plan (DFRMP) Update 2021.
-
IC 248 – Public Consultation Report 2021 (7.19 MB)
Full report on the public consultation measures undertaken for the DRBMP & DFRMP Updates 2021. Included is an overview on measures, reply overview table and all original comments raised by... -
ICPDR Annual Report 2020 (5.87 MB)
-
Online Public Consultation Questionnaire Results 2021 (1.33 MB)
Analysis and results from the online questionnaire, hosted on ICPDR.org during the public consultation period in 2021. -
DRBMP Consultation 2021: EBU (152.48 KB)