Search Results
Displaying 31 - 40 of 58 results found
-
Updated Integrated Tisza River Basin Management Plan 2019 - Annexes (8.08 MB)
-
Updated Integrated Tisza River Basin Management Plan 2019 (4.62 MB)
-
DFRMP Update 2021 Draft Annexes 2-5 (3.28 MB)
-
DFRMP Update 2021 Draft Annex 1 (13.39 MB)
-
DFRMP Update 2021 Draft (6.97 MB)
-
DRBMP Update 2021 Draft ANNEXES (6.97 MB)
-
DRBMP Update 2021 Draft (6.95 MB)
-
ICPDR Logo (pixel) (64.07 KB)
Pixel-based .jpg-version of the ICPDR logo (2016). Danube River Basin Management Plan (DRBMP) Update 2015
Since the publication of the first Danube River Basin Management Plan (DRBMP) in 2009, the ICPDR updates the DRBMP every six years as requested by the EU Water Framework Directive. On this page you can download the Danube River Basin Management Plan (DRBMP) Update 2015 and all its annexes and maps.
Danube Flood Risk Management Plan (DFRMP) 2015