Search Results
Displaying 1 - 10 of 11 results found
-
IC 248 – Public Consultation Report 2021 (7.19 MB)
Full report on the public consultation measures undertaken for the DRBMP & DFRMP Updates 2021. Included is an overview on measures, reply overview table and all original comments raised by... -
Our Opinion – Our Danube: Final Report (822.59 KB)
Final Report on the Stakeholder Consultation Workshop "Our Opinion – Our Danube", held online 29th & 30th June 2021. This report includes participant feedback. -
Interim Overview: Significant Water Management Issues in the Danube River Basin District (583.78 KB)
Interim overview on the Significant Water Management Issues to meet the requirements of WFD (Directive 2000/60/EC) Article 14 regarding public information and consultation in preparation of developing... -
Interim Overview_SWMI Document for Consultation 2020 (746.83 KB)
-
FRM Plan: Draft Annex 4 (Bilateral Agreements) (162.78 KB)
The draft Annex 4 of the 1st Flood Risk Management Plan for the DRB, provided for public comments. -
FRM Plan: Draft Annex 3 (Competent Authorities) (126.9 KB)
The draft Annex 3 of the 1st Flood Risk Management Plan for the DRB, provided for public comments. -
FRM Plan: Draft Annex 2 (Measures) (288.2 KB)
The draft Annex 2 of the 1st Flood Risk Management Plan for the DRB, provided for public comments. -
FRM Plan: Draft 1st Flood Risk Management Plan for the DRB (9.31 MB)
The draft 1st Flood Risk Management Plan for the Danube River Basin, provided for public comments -
DRBM Plan - Update 2015: Draft Annex (3.97 MB)
The annex of the draft Danube River Basin Management Plan Update 2015, provided for public comments. -
DRBM Plan - Update 2015: Draft Report (4.3 MB)
The draft Danube River Basin Management Plan Update 2015 Report, provided for public comments.