Search Results
Displaying 1 - 10 of 16 results found
Danube Watch 3/2021 - ICPDR Presidency 2022
-
IC 248 – Public Consultation Report 2021 (7.19 MB)
Full report on the public consultation measures undertaken for the DRBMP & DFRMP Updates 2021. Included is an overview on measures, reply overview table and all original comments raised by... -
Our Opinion – Our Danube: Final Report (822.59 KB)
Final Report on the Stakeholder Consultation Workshop "Our Opinion – Our Danube", held online 29th & 30th June 2021. This report includes participant feedback. -
Updated Integrated Tisza River Basin Management Plan 2019 - Annexes (8.08 MB)
-
Updated Integrated Tisza River Basin Management Plan 2019 (4.62 MB)
-
Interim Overview: Significant Water Management Issues in the Danube River Basin District (583.78 KB)
Interim overview on the Significant Water Management Issues to meet the requirements of WFD (Directive 2000/60/EC) Article 14 regarding public information and consultation in preparation of developing... -
Interim Overview_SWMI Document for Consultation 2020 (746.83 KB)
-
Annexes of the Integrated Tisza River Basin Management Plan 2010 (7.01 MB)
-
FRM Plan: Draft Annex 4 (Bilateral Agreements) (162.78 KB)
The draft Annex 4 of the 1st Flood Risk Management Plan for the DRB, provided for public comments. -
FRM Plan: Draft Annex 3 (Competent Authorities) (126.9 KB)
The draft Annex 3 of the 1st Flood Risk Management Plan for the DRB, provided for public comments.