Search Results
Inspiring and Fruitful ICPDR Hydropower Workshop in Vienna
The ICPDR held a highly successful workshop titled "Sustainable Hydropower Development and Environmental Objectives – Framework, Challenges, and Ways Forward" on 4-5 June 2024 at the BOKU River Lab in Vienna. Building on workshops from 2017 and 2021, the event brought together experts from energy and environmental policy sectors, the hydropower industry, NGOs, and researchers.
ICPDR publishes a technical report on accidental pollution hazard
Presenting the latest in hazard and risk assessments, the ICPDR Technical Report on Accidental Pollution Hazards provides an in-depth analysis of accidental pollution. It highlights updated inventories for Accident Hazard Sites (AHS) and Tailings Management Facilities (TMF), employing advanced methodologies like the Water Hazard Index and Tailings Risk Index. Focusing on the most hazardous sites, the report also offers key recommendations for sustainable pollution prevention
Accident Prevention and Control in the Danube River Basin: An ICPDR Technical Report Targeted to the Public
The ICPDR has published an informative summary report on accident prevention and control for dissemination to the interested public. It highlights the ICPDR activities on basin-wide level for accident prevention and emergency management, focusing on the tools, pragmatic procedures and mechanisms that are available for the ICPDR member countries.
Practical Tools and Policy Recommendations to Improve the Safety of Tailings Management Facilities in the Danube River Basin
Improving the safety of Tailings Management Facilities (TMFs) throughout the Danube River Basin is a key issue for the ICPDR, and we've now published a paper of policy recommendations.
Improving the Safety of Tailings Management Facilities in the Danube River Basin
Since March 2019, the ICPDR, in cooperation with the Babes-Bolyai University and the non-governmental organisation, “Sustainable Development Platform”, has been implementing a new project: “Capacity development to improve safety conditions of tailings management facilities in the Danube River Basin – Phase I: North-Eastern Danube countries”.
Guiding Principles on Hydropower adopted
Sarajevo, 19 June 2013. As an essential step in maintaining a dialogue with the hydropower sector, the ICPDR's Standing Working Group has adopted the "Guiding Principles on Sustainable Hydropower Development in the Danube Basin". The document is available for download here.
Conference on Hydropower and Water Management
Ljubljana, 26/27 March 2013. Organised by Slovenia and the ICPDR, a conference on hydropower and water management will be held where draft guiding principles will be discussed with a broader audience, accompanied by presentations on practical examples for the application.
1st ICPDR Workshop on Hydropower and Water Management
Timişoara, 21/22 February 2012. Cooperation on navigation is already ongoing and has now been launched for hydropower: efforts are needed in creating win-win situations and benefits for all actors involved. The 1st ICPDR Workshop on Hydropower and Water Management was organised by Romania (Apele Romane) in close cooperation with the other two Lead Countries Austria and Slovenia and the ICPDR.
Red Sludge Spill in Hungary: One year after the accident
Kolontár, 4 October 2010. A dam at a Hungarian aluminium factory near Kolontár broke. Approximately 1.5 million cubic metres of alkaline red sludge and water were released with disastrous consequences: 10 people died, hundreds of hectares of agricultural land were contaminated. One year after these events, we collected information on the current environmental conditions in the area. As an ongoing effort, the Accident Prevention and Control Expert Group of the ICPDR continues its work to avoid or mitigate such disasters in the future.
Recent measures in Hungary: Update on the redsluge accident management
Ajka, 15 November 2011. The redsludge accident of October 4 has generated a world-wide interest in the area of Ajka in Western Hungary. Since then, media attention has ceased. This article aims to provide an English summary of the measures that were taken to manage the accident since October 20.