Search Results
The 2024 Interim Report on the Implementation of the Joint Programme of Measures in the Danube River Basin is Published
The 2024 Interim report on the Implementation of the Joint Program of Measures in the Danube River Basin has been published This Interim Report on the Implementation of the Joint Programme of Measures in the Danube River Basin, published three years after the adoption of the DRBMP Update 2021, reflects accomplishments and progress made together by Danube countries over the past three years, but also looking back at the adoption of the EU WFD more than 20 years ago.
New Report Highlights the Urgent Need for Improved Water Resilience Across Europe
The European Environment Agency (EEA) has released its latest report, “Europe’s State of Water 2024: The Need for Improved Water Resilience,” shedding light on the growing challenges to Europe’s water security. The report, which draws on data from the 3rd River Basin Management Plans (RBMPs), highlights significant pressures on surface and groundwater bodies across Europe, emphasizing the need for immediate action to strengthen water resilience.
Severe Droughts in the Danube River Basin
As the climate crisis worsens, severe droughts devastate European landscapes. According to the data published by the European Drought Observatory, more than 60% of land in the European Union and United Kingdom – an area nearly the same size as India (!) – is now affected by drought conditions. The Danube River Basin and the Danube itself have been affected by serious droughts in the past, e.g., in 2003, 2015, and now again one of the most feared natural phenomenon has gripped much of the Danube River Basin.
2018 Interim Report on the Implementation of the Joint Programme of Measures in the Danube River Basin
The ICPDR has released a 23-page Interim Report on the implementation of its ‘Joint Program of Measures in the Danube River Basin’. The brochure is both a snapshot of the progress being made, and a look at the future of the ICPDR’s three main aims: to make Danube waters “cleaner”, “healthier”, and “safer”. It’s also the first such publication by the ICPDR to take on a new design-focused look, deploying more images and a clearer language in a public-friendly format.
ICPDR releases Report on the 2015 droughts in the Danube River Basin
In 2015 significant parts of the Danube River Basin were affected by droughts which negatively impacted different water-dependent economic sectors, vegetation and the aquatic environment. This is the latest of a series of drought events which occurred in Europe during the last decade.
Workshop on Joint Program of Measures
Vienna, 4-5 April 2013. The ICPDR will hold a meeting to discuss the results of the Danube Joint Program of Measures, to learn about funding needs and existing potential funding for the actions, and to discuss the preparation of the Danube Basin Analysis and the 2nd Danube River Basin Management Plan.
2012 interim report on implementation of Joint Program of Measures
Vienna, 10 Jan 2013. The 2012 "Interim Report on the Implementation of the Joint Program of Measures in the Danube River Basin District" was published by the ICPDR. Here you can download the document.