Search Results
Public Consultation for the Draft Management Plan Updates 2027
The ICPDR supports the active involvement of stakeholders and civil society on all levels of its work. Two of the most important plans to the ICPDR are the Danube River Basin Management Plan and the Flood Risk Management Plan, aiming to implement the legal requirements of Water Framework Directive (WFD) and the Floods Directive (FD), comprising strategic guiding plans for water management over the course of six years. Both are to be updated with a range of public consultation measures.
Economics
Water has an economic value in all its competing uses and therefore needs to be recognized as an economic good. In order to protect water as a valuable ressource, investments are needed to be implemented by Danube countries. The implementation of measures is beneficial for all sectors including water-related ecosystems.
Welcome to a milestone celebration!
Climate Change Adaptation Measures Toolbox
This page provides a comprehensive and easy to use toolbox of possible adaptation measures. Please select one or more of the group filters below to obtain detailed information on the measures of interest.
Plastics
Evidence on plastic pollution has already been gathered in both the freshwater systems and the marine environment (including the Danube and the Black Sea) over the last decades. Scientific investigations identified strong linkages between marine pollution, terrestrial areas and land-based activities. Poor waste management, everyday littering, plastic industry facilities, consuming of products of textile and cosmetic industries in households and tire abrasion pollute rivers that further discharge plastic litter into the receiving seas. While priority should be given to reducing plastic pollution at source, river clean-up actions are also highly important to eliminate plastic litter accumulation hot-spots.
Accessibility statement
We're committed to making our websites accessible to a wide audience, making them usable by as many people as possible.
Water Users
One of the primary advantages provided by the ICPDR is its capacity to assist national decision-makers in effectively balancing the competing needs and various uses of the Danube River. These encompass areas such as hydropower generation, agriculture, and climate risk management. The ICPDR functions as a comprehensive platform for member countries, facilitating consultation, coordination, and the holistic management of the Danube River Basin.
Our Topics
In the Danube River Basin, five main pressures that affect water status: organic substance pollution, nutrient pollution, hazardous substance pollution, hydromorphological alterations and effects of climate change (drought, water scarcity, extreme hydrological phenomena and other impacts), have been identified as Significant Water Management Issues (SWMIs). The groundwater quantity and quality are also under constant pressure.
Flood Hazard and Risk Maps
According to Floods Directive, the Member States shall, at the level of the river basin district or unit of management, prepare flood hazard maps and flood risk maps at the most appropriate scale for the areas identified under Article 5(1).
Preliminary Flood Risk Assessment (PFRA)
In accordance with Article 4 of the EU Floods Directive (FD), the first milestone in the FD basin-wide implementation is undertaking a preliminary flood risk assessment (PFRA), as well as identifying those areas for which it has been concluded that potential significant flood risks exist or might be considered likely to occur, so-called Areas of Potential Significant Flood Risk (APSFR), as in accordance with FD Article 5.