Search Results

Displaying 1 - 6 of 6 results found
  • Content pages

    Groundwater

    Groundwater constitutes the largest reservoir of freshwater in the world, accounting for over 97% of all freshwaters available on earth (excluding glaciers and ice caps). The remaining 3% is composed mainly of surface water (lakes, rivers, wetlands) and soil moisture. By incorporation into the Water Framework Directive (WFD), groundwater became part of an integrated water management system.

  • Content pages

    Flood Risk Management

    In response to the hazard of flooding, the ICPDR adopted the Action Programme for Sustainable Flood Prevention in the Danube River Basin at the ICPDR Ministerial Meeting on 13 December 2004. As a follow-up to this Action Programme, seventeen sub-basin flood action plans were published by the ICPDR in 2009.

  • Content pages

    Croatia Facts & Figures (150.25 KB)

  • Content pages

    Flood Action Plans

    17 flood action plans for all sub-basins in the Danube catchment area were prepared in 2009. They provide the first comprehensive overview of actions aiming to reduce flood risks that was ever prepared in Danube River Basin.

  • Content pages

    UNDP/GEF Tisza MSP

    The Tisza Basin has been subject to significant anthropogenic impacts that have resulted in a degraded system, particularly in terms of pollution and the loss of floodplains and wetlands. The present project is focusing on the development of strategies and implementation of demo project to test the multiple environmental benefits of wetlands to mitigate impacts of floods/droughts and help to reduce nutrient pollution.

  • Content pages

    Tisza Group

    At the first ministerial meeting of the ICPDR countries held in December 2004, ministers and high-level representatives of the five Tisza countries signed a Memorandum of Understanding, establishing the ICPDR Tisza Group for coordination as well as implementation of an international integrated Tisza River Basin cooperation under the umbrella of the ICPDR. After 15 years of successful cooperation the ICPDR Tisza Group will focus on the implementation of the updated ITRBMP.