Search Results

Displaying 1 - 10 of 10 results found
  • Content pages

    Flood Hazard and Risk Maps

    According to Floods Directive, the Member States shall, at the level of the river basin district or unit of management, prepare flood hazard maps and flood risk maps at the most appropriate scale for the areas identified under Article 5(1).

  • Content pages

    Preliminary Flood Risk Assessment (PFRA)

    In accordance with Article 4 of the FD, the first milestone in the FD basin-wide implementation is undertaking a preliminary flood risk assessment (PFRA), as well as identifying those areas for which it has been concluded that potential significant flood risks exist or might be considered likely to occur (so-called Areas of Potential Significant Flood Risk (APSFR)) as in accordance with FD Article 5.

  • Content pages

    Public Consultation: Results

    This page contains all of the various documentation on outcomes from the ICPDR's Public Consultation Process for the Danube River Basin Management Plan & Danube Flood Risk Management Plan Updates 2021

  • Content pages

    Stakeholder Consultation Workshop: Our Opinion – Our Danube

    This online workshop took place on 29th/30th June 2021, with more than 130 participants attending.

  • Content pages

    Public Consultation Process towards the 2021 Management Plans Updates

    The ICPDR supports the active involvement of stakeholders and civil society on all levels of its work. Two of the most important plans to the ICPDR are the Danube River Basin Management Plan and the Flood Risk Management Plan, aiming to implement the legal requirements of WFD and FD, comprising strategic guiding plans for water management over the course of six years. Both are to be developed with a range of public consultation measures.

  • Content pages

    Flood Protection Expert Group

    The Flood Protection Expert Group (FP EG) deals with ICPDR activities concerning sustainable flood risk management and the development and implementation of the Danube River Basin Flood Risk Management Plan.

  • Content pages

    Danube FloodRisk Project

    The overall objective of the Danube FLOODRISK project was to develop and produce high quality, stakeholder oriented flood hazard and flood risk maps for the transnational Danube river floodplains to provide adequate risk information for spatial planning and economic development activities.

  • Content pages

    Flood Risk Management

    In response to the hazard of flooding, the ICPDR adopted the Action Programme for Sustainable Flood Prevention in the Danube River Basin at the ICPDR Ministerial Meeting on 13 December 2004. As a follow-up to this Action Programme, seventeen sub-basin flood action plans were published by the ICPDR in 2009.

  • Content pages

    Flood Action Plans

    17 flood action plans for all sub-basins in the Danube catchment area were prepared in 2009. They provide the first comprehensive overview of actions aiming to reduce flood risks that was ever prepared in Danube River Basin.

  • Content pages

    Floods

    Floods are natural phenomena. They can, however, turn into disasters causing widespread damage, health problems and even deaths. This is especially the case where rivers have been cut off from their natural floodplains, are confined to man-made channels, and where houses and industrial sites have been constructed in areas that are naturally liable to flooding.